Skip to main content

Breaking up material, in Qatar

January 7, 2019 Read time: 2 mins
MB Crusher equipment is being used to help build facilities for the 2022 World Cup in Qatar

Screening attachments from 283 MB Crusher are carrying out useful work in Qatar on the construction project to build the new 2022 World Cup stadia.

The firm says that this will be the third time the World Cup has seen the use of mobile crushing or screening attachments from MB Crusher being used, with similar units having been employed for the 2014 event in Brazil and the 2010 event in South Africa.

The local construction company involved in these projects, Al-Jaber and Makhlouf Company, is using an MB-S18 screening bucket for the works of Al Furousiya Street, in the Aspire Zone.

With just one piece of equipment connected to a 233 Hitachi excavator, the company has been able to complete work at a site that would have required much more time, more resources and cost more. The excavated material was screened by the MB-S18. The coarser part was used as a sub-base, while the fine part was mixed with sand and used as base.

Because the large processing plants are about 50km from the site, the use of the MB screener reduced truck journeys on a road that already has a high traffic load. And by processing and reusing the excavated material directly on site, processing times and procurement costs have been halved.

The MB equipment will also be used on further projects in Qatar, including building new transport infrastructure. Jobs still planned in the country include the construction of a 320km new metro network, and the connection of all the stadia with the country's motorway system.

For more information on companies in this article

Related Content

  • Volvo CE machines boost output for US quarry
    June 28, 2018
    At Savage Stone’s 161.9ha quarry in Jessup, Maryland, gabbro is extracted from five 13.1m-tall benches, with chemical rock hardness increasing with each lower level. The shot rock (similar to granite and good for coarse road base) used to be loaded into Volvo 31tonne and 36tonne capacity articulated haulers and 90tonne capacity Euclid rigid haulers and transported 800m uphill to the primary crusher, a Lippmann 5062 jaw crusher. The jaw crusher processes rock to 127-178mm, which is then stockpiled on the s
  • Major highway growth in Portugal
    February 14, 2012
    Twenty years ago Portugal was bottom of the European league in terms of roads and safety. A series of ambitious plans has seen the country rise to the top. Patrick Smith reports on how this was achieved
  • Danish digging for Leica Geosystems’ 3D machine control
    October 26, 2017
    In Denmark’s northern Jutland, Leica Geosystems’ equipment is being used to help build a 40km motorway, one of the fastest-built such projects in the country’s history. The Danish Road Directorate is the client for the €5.4 million motorway between the two Danish cities of Herning, to the south with around 50,000 people, and Holstebro, a city of about 35,000 people, north of Herning. Preliminary ground investigations were made in 2013 and work started in 2015 with completion set for 2018.
  • Building a major Turkish highway project
    August 15, 2018
    The North Marmara Motorway Project in Turkey has been a major focus for project financing, as well as for novel technical solutions for its construction. This mega infrastructure project is intended to boost transport connectivity between the European and Asian sides of Turkey International law firm Winston & Strawn LLP has advised on major project financing for two sections of the highway. The structure for implementation of the Project is based on the build-operate-transfer (BOT) concession model. The