Skip to main content

Astec’s Batch RAP stems ahead

Standards are changing to allow higher percentages of RAP, and batch plant owners want to take advantage of the recycled material. But unsightly steam and dust can escape from the mixer. The best way to counter this is to meter the amount of RAP being added to a batch system rather than adding it all at once. This is where Astec’s Batch RAP system comes into play. “The trouble with running RAP in a batch plant is that if you just dump the RAP in fast, you have serious problems with steam,” according t
August 24, 2016 Read time: 3 mins
Standards are changing to allow higher percentages of RAP, and batch plant owners want to take advantage of the recycled material. But unsightly steam and dust can escape from the mixer.

The best way to counter this is to meter the amount of RAP being added to a batch system rather than adding it all at once. This is where 1250 Astec’s Batch RAP system comes into play.

“The trouble with running RAP in a batch plant is that if you just dump the RAP in fast, you have serious problems with steam,” according to engineer Mike Varner, director of thermal systems and research for US-based Astec. “Water expands 1,700 times when it changes to steam and when that occurs over a few seconds, you create a huge amount of steam.”

Greg Renegar, chief engineer at Astec, says the plant’s exhaust system has no way to accommodate that steam. “The baghouse can’t handle the amount of steam produced when water and RAP are dropped in.”

According to Varner, the addition of 25% RAP to a 2.76tonne batch is the equivalent of adding 5%, or approximately 34kg, of moisture.

“That 34kg of moisture turns into almost 60m3 of steam,” says Varner. “A baghouse fan cannot suck hard enough to keep up with the steam. Dust and steam will come out of every crack at the top of the plant.”

By using the Batch RAP system rather than “dumping in” the RAP in a five-second time frame, recycled material is dribbled in at a rate of 1% of RAP per second.

With the variable speed for the feeder belt, which introduces RAP directly into the pug mill, the introduction of RAP is at a more reasonable level. Controlling the speed and rate that RAP is fed into super-heated virgin material means steam that comes off the RAP as it hits the superheated mix can be eliminated or contained and controlled.

Varner said more companies are running RAP to remain competitive with continuous-mix plants. The Batch RAP system enables plant owners to use RAP on an old batch plant, which originally wasn’t set up for RAP use. The computer monitoring system hooks into the existing computer controls.

In the north-eastern US, Varner says that RAP is available from milling several miles of roads, and older plants in that region of the country need additional RAP facilities. Also, continuous plants can run 30-40% of RAP, while batch plants typically don’t run RAP well.

“The whole intent of the Batch RAP system is to make the introduction of RAP as continuous as possible for a batch plant,” says Varner. “That means less strain on the exhaust system and makes the batch plant more like a continuous plant in respect to RAP.”

For more information on companies in this article

Related Content

  • Quarry operators improve on productivity
    February 13, 2012
    With capital expenditure plans being reduced, many quarry operators are using the funds available to improve on productivity with their existing equipment fleets. Claire Symes reports. The economic downturn has had a big impact on the aggregates production sector with many quarry operators looking to reduce costs and rationalise operations. The impact of this can be seen in the reduction of capital expenditure plans but the investments that are being made are focused on efficiency.
  • Well-educated personnel are the best investment for the future says the Ammann international training centre
    May 20, 2014
    Far too often, managers will view training as a luxury and not as a competitive and strategic necessity. Lazy team leaders regularly argue that it is a waste of time and money training their people, not least because these same trainees might subsequently leave the organisation. Courses are seen as an interruption, and a good way to delay things. There is always something much more pressing and important on the to-do list and staff can end up feeling forced into the training department. But these are weak a
  • New M90 surfacing in the UK gain praise
    January 8, 2013
    Early evaluation of surfacing work on the M90 at Rosyth – the first major application of Scotland’s new TS2010 specification – has earned positive praise. Transport Scotland’s determination to obtain pavement that is durable, long lasting and safe (especially in early life) is clearly apparent on the M90 just north of the Forth Road Bridge. Here surfacing has been carried out this spring to TS2010, a tough new specification designed to ensure thin surfacing pavements that work. And the initial prognosis is
  • Meeting engine emission regulations challenges
    February 16, 2012
    New engine emission regulations pose major challenges for engine manufacturers - Geoff Ashcroft reports. The arrival of emissions regulations in January for engines over 130kW has meant that engine makers have adopted varied technologies to meet and exceed those goals. For the end user though, buying new kit that complies with Tier 4 Interim/Stage IIIB emissions regulations is likely to carry additional costs.