Skip to main content

Astec’s Batch RAP stems ahead

Standards are changing to allow higher percentages of RAP, and batch plant owners want to take advantage of the recycled material. But unsightly steam and dust can escape from the mixer. The best way to counter this is to meter the amount of RAP being added to a batch system rather than adding it all at once. This is where Astec’s Batch RAP system comes into play. “The trouble with running RAP in a batch plant is that if you just dump the RAP in fast, you have serious problems with steam,” according t
August 24, 2016 Read time: 3 mins
Standards are changing to allow higher percentages of RAP, and batch plant owners want to take advantage of the recycled material. But unsightly steam and dust can escape from the mixer.

The best way to counter this is to meter the amount of RAP being added to a batch system rather than adding it all at once. This is where 1250 Astec’s Batch RAP system comes into play.

“The trouble with running RAP in a batch plant is that if you just dump the RAP in fast, you have serious problems with steam,” according to engineer Mike Varner, director of thermal systems and research for US-based Astec. “Water expands 1,700 times when it changes to steam and when that occurs over a few seconds, you create a huge amount of steam.”

Greg Renegar, chief engineer at Astec, says the plant’s exhaust system has no way to accommodate that steam. “The baghouse can’t handle the amount of steam produced when water and RAP are dropped in.”

According to Varner, the addition of 25% RAP to a 2.76tonne batch is the equivalent of adding 5%, or approximately 34kg, of moisture.

“That 34kg of moisture turns into almost 60m3 of steam,” says Varner. “A baghouse fan cannot suck hard enough to keep up with the steam. Dust and steam will come out of every crack at the top of the plant.”

By using the Batch RAP system rather than “dumping in” the RAP in a five-second time frame, recycled material is dribbled in at a rate of 1% of RAP per second.

With the variable speed for the feeder belt, which introduces RAP directly into the pug mill, the introduction of RAP is at a more reasonable level. Controlling the speed and rate that RAP is fed into super-heated virgin material means steam that comes off the RAP as it hits the superheated mix can be eliminated or contained and controlled.

Varner said more companies are running RAP to remain competitive with continuous-mix plants. The Batch RAP system enables plant owners to use RAP on an old batch plant, which originally wasn’t set up for RAP use. The computer monitoring system hooks into the existing computer controls.

In the north-eastern US, Varner says that RAP is available from milling several miles of roads, and older plants in that region of the country need additional RAP facilities. Also, continuous plants can run 30-40% of RAP, while batch plants typically don’t run RAP well.

“The whole intent of the Batch RAP system is to make the introduction of RAP as continuous as possible for a batch plant,” says Varner. “That means less strain on the exhaust system and makes the batch plant more like a continuous plant in respect to RAP.”

For more information on companies in this article

Related Content

  • MASSENZA’s compact bitumen plant for small batches
    May 19, 2015
    Italian bitumen plant manufacturer MASSENZA has developed its EASY 3500 SK unit as an entry model for emulsion manufacturing businesses that are on tight budgets and require small production batches of 1-3tonnes/hour. The firm has also sold one of these, its 400th emulsion plant, into the French overseas department of Reunion, an island in the Indian Ocean.
  • Cross safely with the SR-CROSSLED-S by Sernis
    August 31, 2021
    Similar to normal road studs, Sernis' SR-CROSSLED-S can be controlled with a PC500 unit.
  • Urban resurfacing on tracks with Caterpillar Paving
    July 9, 2024
    A UK contractor is making good use of its latest Caterpillar’s Cat Mobil-Trac paver for urban resurfacing works – Mike Woof reports
  • Campaign urges UK drivers to get eye tested every 2 years
    August 5, 2013
    A new campaign is calling on UK drivers to ‘sharpen up’ their act by getting their eyesight tested every two years to ensure their vision meets legal standards and they aren't putting people in danger. The campaign by road safety charity Brake, in association with the DVLA, insurer RSA and Specsavers, comes as new research shows many drivers are failing to ensure they can see properly on every journey. A survey of 1,000 UK drivers by Brake, RSA and Specsavers finds that a quarter of drivers (26%) haven't ha