Skip to main content

Polish road dispute

Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw.
March 2, 2012 Read time: 1 min
Questions are being asked in Poland over the poor performance of the recently paved S8 dual carriageway, close to capital Warsaw. The 3519 Polish General Directorate for National Roads and Motorways (GDDKiA) is asking the consortium that built the S8 link, which comprises, 3302 Budimex 3546 Dromex, 945 Strabag, 3544 Warbud and 3304 Mostostal Warszawa, to repair the affected section. GDDKiA has said that the asphalt density is too low and there are cracks in the road. However, the consortium has responded that the problems have arisen as the project schedule called for work to be carried out during winter, causing fast cooling of the asphalt mat, which affected compaction.

Related Content

  • Poland eyes PPP for four major highway sections worth €2.32 billion
    June 18, 2018
    Poland will use the public-private partnership model for four road sections worth in total €2.32 billion. The roads are the S6 running from Koszalin to the DK6 at Bozepole Wielkie, the S10 from Bydgoszcz to Torun, the western ring-road of Szczecin and the ring-road around the TriCity metropolis. Tenders will be issued likely by the end of the year or the first quarter 2019, according to Polish media. The decision to adopt the PPP model for infrastructure projects is partly a response to the reduction
  • Astaldi begins drilling tunnels on Poland’s S7 dual carriageway
    March 14, 2017
    Italian contractor Astaldi has begun drilling two parallel tunnels as part of its S7 dual carriageway project in Poland. Each tunnel, between Naprawa and Skomielna Biala and under the Lubon Maly massif, will each be just over 2km long. Astaldi, based in Rome, won the three-year S7 dual carriageway project worth around €225 million in 2016 Work includes 38 bridges and viaducts and three motorway services. There will also be 25km of access roads and two junctions. The north-south S7, when complete
  • Polish Via Carpathia section attracts 11 bids
    July 17, 2020
    Turkish contractor Kolin Insaat has submitted the lowest bid.
  • Funds for Poland’s highways maintenance, repairs
    May 14, 2012
    Poland’s government plans to boost highways spending in 2011 with a budget of €8.72 billion, an increase of €3.73 billion over the budget set for 2010. However, there is some scepticism as to how such a substantial sum will be found, especially given the spending restrictions the country is already seeing.