Skip to main content

Call for rising bitumen cost to be factored into highways contracts

Rising bitumen prices should be factored in more consistently when awarding highways contract tenders, according to Tarmac National Constructing (TNC). The near 60% bitumen price hike of the last two years, driven by a major decrease in European refinery production, is said by TNC to be making it “extremely difficult” for highways contractors to tender for work, as current price fluctuation mechanisms do not fairly compensate for significant extra input costs. TNC says that while the Highways Agency’s
April 20, 2012 Read time: 2 mins
Rising bitumen prices should be factored in more consistently when awarding highways contract tenders, according to 2399 Tarmac National Constructing (TNC).

The near 60% bitumen price hike of the last two years, driven by a major decrease in European refinery production, is said by TNC to be making it “extremely difficult” for highways contractors to tender for work, as current price fluctuation mechanisms do not fairly compensate for significant extra input costs.

TNC says that while the 2309 Highways Agency’s Category Management Contracts and a minority of council tenders use appropriate price fluctuation mechanisms, they are not being consistently applied across all national network and local authority road contracts.

The leading UK road maintenance and highways services company says it is turning to alternative road construction methods with bitumen, which accounts for around a third of the cost of constructing a new road, being replaced with composite road construction on new build schemes.

Paul Fleetham, managing director of TNC and Middle East, said:

“With one of the largest UK refiners, 741 Petroplus, entering administration last month, the general trend is for less bitumen to be available, exerting additional cost pressures.

“The industry is at a tipping point as it tries to recover these exceptional increases on existing contracts and anticipate the negative impact these may have when tendering for future long-term highway works.”

For more information on companies in this article

Related Content

  • US road safety is a cause for concern
    September 6, 2021
    There is concern over a worrying trend in US road safety, while there have been steady gains in road safety in Europe
  • Developments in tolling technology
    February 27, 2012
    Jason Barnes reviews the last few decades and the future of tolling technology. Tolling and charging technology has evolved significantly over the last three decades and that evolution is perhaps best illustrated by reductions in or complete removal of impedances to physical progress. Once, it was customary for a driver to pull up to a barrier, make some form of cash payment to a human operative in a booth, and then wait for the barrier to be raised before proceeding. Humans were eventually complemented and
  • The cycle of potholes in the UK
    May 9, 2019
    Since 2015 almost a million potholes have been recorded annually by UK local authorities, with the 2016 count reaching 1,088,965, according to an insurance provider. The Insurance Emporium obtained data from 175 local authorities and compared it to the incidence of injury and damage claims made against these authorities by cyclists. During 2017-18, there were 335 pothole damage and injury claims filed against local authorities. Personal and dental injuries to cyclists accounted for 16% of these and d
  • Road marking system providers’ latest technology in-demand
    April 3, 2014
    The latest road marking systems from leading manufacturers are in demand in Europe, Africa, the Middle East and South America. Guy Woodford reports Ennis-Flint recently saw its Third Generation Waterborne Fast Dry Paint with low VOC applied on a Portuguese motorway by Trafiurbe and F.L Gaspar, two of the country’s leading contractors. The line marking is said to have been applied in response to demands from Portuguese authorities for higher specifications of line markings across the country’s highway net