Skip to main content

Building india's new Hyderabad-Bangalore motorway

The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions. It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.
April 13, 2012 Read time: 2 mins
MB crusher buckets are working on the new Hyberrabad-Bangalore motorway
The first motorway connecting the cities of Hyderabad-Bangalore will be approximately 600km long, with three lanes in both directions.

It will represent an important change in India as the country will benefit from a fast and greater flow of communication, transportation and commerce networks, which up until now have been carried out mainly by sea.

Italian company 283 MB is supplying crusher buckets to help build the motorway: the BF120.4 bucket will be used to produce the stabilised pavements every 50km.

According to MB a feature of the BF120.4 is that it is the only piece of equipment capable of reducing the size of crushed granite from 20cm to 4cm, thus "making the job easier and more versatile." The Breganze-based company (currently in the process of obtaining the ISO 14001 certification) says that its buckets work using the hydraulic system of the excavator they are fitted to, and, "unlike traditional crushers, offer significantly reduced transportation and waste disposal costs, thus allowing inert materials to be recycled." Guido Azzolin, managing director of MB, said: "We are extremely optimistic on the successful outcome of the motorway that will connect the cities of Hyderabad and Bangalore, both extremely excited to try out our highly technological, Italian-made buckets and to obtain a new communication line that we are sure will be appreciated by the Indian country."

For more information on companies in this article

Related Content

  • Volvo CE machines boost output for US quarry
    June 28, 2018
    At Savage Stone’s 161.9ha quarry in Jessup, Maryland, gabbro is extracted from five 13.1m-tall benches, with chemical rock hardness increasing with each lower level. The shot rock (similar to granite and good for coarse road base) used to be loaded into Volvo 31tonne and 36tonne capacity articulated haulers and 90tonne capacity Euclid rigid haulers and transported 800m uphill to the primary crusher, a Lippmann 5062 jaw crusher. The jaw crusher processes rock to 127-178mm, which is then stockpiled on the s
  • Chinese construction equipment manufacturers increasing export focus
    December 2, 2013
    Chinese firms are growing their expertise in terms of products and international sales – Mike Woof reports China’s major off-highway construction equipment manufacturers have grown in a relatively short period and now number amongst the largest players in the sector. Some of the key firms are looking to boost exports and are providing tough competition, particularly in the emergent markets. Best known for its wheeled loaders, LiuGong has been developing its excavator range, with production of the E
  • Iterchimica trials G+ graphene modifier from Directa Plus
    February 7, 2020
    UK village gets trial paving of a super modifier containing graphene.
  • A vision of roads
    September 3, 2012
    By 2040 European roads could be built differently, and hopefully be safer, according to the EU research programme NR2C