Skip to main content

Upgrading a Benninghoven asphalt plant with new technology

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities. To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP). The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour.
October 18, 2017 Read time: 2 mins
The Benninghoven asphalt plant upgrade will boost quality and RAP capabilities for the contractor

Benninghoven plant owned by Breisach-based Johann Joos Tief- und Straßenbauunternehmung is 40 years old but now features new technology, increasing its range of capabilities.

To meet demands for the use of RAP, the plant has been reconfigured with the latest technology from 167 Benninghoven. This new addition to the plant will allow its facility as a Recycling Priority Plant (RPP).

The plant upgrade features a Benninghoven BA 4000 system with a capacity of up to 320tonnes/hour. It is equipped with a parallel counterflow drum, providing indirect heating of the RAP. This configuration ensures that the bitumen contained within the RAP is not damaged by direct heating. According to the firm, this layout allows higher RAP percentages (as much as 90% is claimed) to be processed in the mix than with conventional plants.

At the same time, the plant also meets the latest German emissions requirements. Asphalt produced by the plant is at a temperature of 160°C, while its efficient operation is said to deliver major savings in fuel consumption. According to Benninghoven, the configuration of the counterflow drum and the indirect hot gas heating system ensures that product quality is maximised while exhaust and heat emissions are minimised, boosting overall efficiency.

In addition to the hot feed system with its parallel drum and hot gas generator, the plant has also been retrofitted with a cold feed system: a multivariable feed hopper for a RAP material rate of up to 40%. Meanwhile, the preliminary batching units and other components from the previous plant were retained.

The plant has an EVO JET 4 combination burner for oil and coal dust delivering 23.7MW. It has a six-level screening system as well as a hot bin section with a capacity of 170tonnes in seven bins and mixed material storage silos holding 420tonnes. Other new components included a full enclosure around the plant, a filler tower and the latest Benninghoven BLS 3000 control system.

For more information on companies in this article

Related Content

  • Ammann develops versatile and productive mobile asphalt plant
    February 9, 2015
    Ammann claims that its new EcoBatch asphalt plant offers versatility and mobility in a single compact package. This modular plant can deliver 60-80tonnes/hour of high quality material for use in demanding road construction applications. The plant is said to be optimised to reduce wear and maintenance needs, with easy access for servicing. Jean-Luc Didier is sales director for Central-South Europe and said, “It has the same control system and accuracy in dosing as we have in the big plants. There’s no need f
  • Ammann develops versatile and productive mobile asphalt plant
    January 6, 2017
    Ammann claims that its new EcoBatch asphalt plant offers versatility and mobility in a single compact package. This modular plant can deliver 60-80tonnes/hour of high quality material for use in demanding road construction applications. The plant is said to be optimised to reduce wear and maintenance needs, with easy access for servicing. Jean-Luc Didier is sales director for Central-South Europe and said, “It has the same control system and accuracy in dosing as we have in the big plants. There’s no need f
  • Ammann’s new continuous asphalt plant innovation for North America is 100% mobile
    March 14, 2023
    A significant innovation from Ammann is a continuous asphalt plant being developed specifically for the North American market. This will offer capacity in the 270-360tonne/hour range that forms the bulk of US demand and will be ready for market during the 2024 paving season.
  • Cleaner asphalt plant from Lintec & Linnhoff Holdings
    November 29, 2018
    The latest asphalt plant from Lintec is said to benefit customers with its ease of installation as well as its low emissions.