Skip to main content

Recycling option

Roadtec is offering a new cold recycling machine, the RT-500, aimed at duties in projects using the recycling train concept. Electrically powered by a Cat C9 generator set, the RT-500 can handle up to 600 tonnes/hour of material and is designed to crush and screen the recycled asphalt pavement (RAP) produced by an RX-900 cold planer. It has a JCI double deck screen that sorts milled material provided by the RX-900's conveyor. Any oversized material is fed back into the RT-500's Telsmith 3048 impact crusher
February 22, 2012 Read time: 2 mins
1252 Roadtec is offering a new cold recycling machine, the RT-500, aimed at duties in projects using the recycling train concept.

Electrically powered by a 2294 CAT C9 generator set, the RT-500 can handle up to 600 tonnes/hour of material and is designed to crush and screen the recycled asphalt pavement (RAP) produced by an RX-900 cold planer. It has a JCI double deck screen that sorts milled material provided by the RX-900's conveyor. Any oversized material is fed back into the RT-500's 2987 Telsmith 3048 impact crusher and back to the screen via a two-conveyor return circuit. The conveyors have cleated belts for maximum production while a water spray system prevents dust build up on rollers and the conveyors are covered for safety and to prevent roll-off.

Material that passes the screen drops onto a 1.22m wide weigh belt with an accurate electronic scale that communicates with the blending computer and adjusts the flow of additives going into the RT-500's JCI/KPI Model 52 pugmill twin shaft mixer with a capacity of 600tonnes/hour. After mixing the material is discharged in a windrow onto the roadway.

The Roadtec RX-900 cold planer provides the propulsion for the recycling train and tows the RT-500 cold recycler and a nurse tank for the emulsions, as well as a water truck and a slurry tanker. The RX-900 also pushes another emulsion tanker and slurry tank when they are present to refill tankers hooked to the train. Those two replenishing tankers are attached to the train long enough to pump off their products and then go to a staging area where they are refilled to return to the train.

A windrow loader also follows the train to pick up material and feed it to a conventional paver.

For more information on companies in this article

Related Content

  • World of Asphalt/AGG1 Aggregates Forum & Expo
    March 14, 2012
    World of Asphalt 2012 and the co-located AGG1 Aggregates Forum & Expo will be the largest in the history of the two events. Guy Woodford reports on some of the technology and equipment set to be on show. With over 6,500m² of exhibit space available, World of Asphalt 2012 (WoA) is among the global showpiece events of the year for all asphalt, pavement maintenance and traffic safety industry professionals.
  • World of Asphalt/AGG1 Aggregates Forum & Expo
    April 13, 2012
    World of Asphalt 2012 and the co-located AGG1 Aggregates Forum & Expo will be the largest in the history of the two events.
  • Smoother highway achieved in Florida
    June 16, 2016
    The busy I-10 in Florida is now benefiting from a smoother surface, following very necessary reconstruction work. There were no completed sections of I-10 until 1961 when the 59km Sanderson to Jacksonville stretch was first finished. In the years since, section by section have been constructed, culminating in the complete stretch of I-10 in Florida, running 579km through the state. The interstate stretches west well beyond the Florida border making I-10 one of three coast-to-coast interstates, along with
  • Increased asphalt demand - meeting the challenge
    February 8, 2012
    With demand for asphalt predicted to increase, manufacturers are ready to meet the challenge as Patrick Smith reports