Skip to main content

Cold recycling with foamed bitumen – an innovative technique

The pressure to conserve materials in road construction means that resource-saving technologies are more in demand than ever before. Wirtgen’s cold recycling process is already proven and has the potential to meet future demand. Roads subjected to continuous and heavy traffic often show signs of damage that extend down to the road base. To eliminate this damage, the entire road needs structural rehabilitation. Full reuse of the milled material as well as its cost-effective treatment make cold recycling with
November 7, 2017 Read time: 3 mins
Wirtgen offers a comprehensive range of equipment and expertise for cold-in-place-recycling methods

The pressure to conserve materials in road construction means that resource-saving technologies are more in demand than ever before. 2395 Wirtgen’s cold recycling process is already proven and has the potential to meet future demand.

Roads subjected to continuous and heavy traffic often show signs of damage that extend down to the road base. To eliminate this damage, the entire road needs structural rehabilitation. Full reuse of the milled material as well as its cost-effective treatment make cold recycling with foamed bitumen efficient and economical.

Foamed bitumen is produced by injecting small quantities of water and air into hot bitumen under high pressure. The water evaporates and makes the bitumen foam up to 15-20 times its original volume. The foam is then injected into a mixer through injection nozzles and mixed into cold and moist construction materials. The quality of the foamed bitumen is primarily described in terms of the parameters ‘expansion ratio’ and ‘half-life’. The greater the expansion ratio and half-life, the more easily the foamed bitumen can be processed.

Cold recycling with foamed bitumen is attracting increasing interest in road construction for asphalt road rehabilitation. It allows the paving of flexible and durable base layers, providing a suitable foundation for the final, thinner asphalt surfacing. New technology is used to produce foamed bitumen from normal bitumen which has been heated to approximately 175°C. With the in-situ method, a precisely dosed quantity of binding agent is added to mineral aggregate inside the Wirtgen 2200 CR or 3800 CR cold recycler or the soil stabilisers of the WR series, using microprocessor-controlled injection systems.

The cold recycling process has proven its worth around the world. In practical use, there are two different methods: an in-situ approach using wheeled or tracked Wirtgen cold recyclers, and the in-plant method using the Wirtgen KMA 200i, a mobile cold recycling mixing plant. The methods allow a large number of materials to be recycled such as milled asphalt, crushed asphalt or new material. The application range for foamed bitumen is varied, and it can also withstand very high traffic loads.

The Ayrton Senna Highway in Sao Paulo is used by more than 250,000 vehicles every day, 15% of them trucks. During the rehabilitation project in 2011, milled material from the asphalt pavement was recycled with foamed bitumen in a Wirtgen cold recycling mixing plant and repaved in two layers by a road paver.

In Greece, the cold recycling projects carried out with foamed bitumen back in 2003/2004 on the motorways between Iliki, Korinthos and Athens have been demonstrating their strength for more than 10 years. These have been carrying traffic volumes of 40,000 vehicles/day including a 25% share of heavy vehicles.

To achieve such results, extensive preliminary tests must be conducted on the entire pavement structure, while the mix produced with foamed bitumen must pass a rigorous mix design test.

For more information on companies in this article

Related Content

  • Time, money and the environment – reducing the costs of a road project
    April 23, 2013
    Road construction has evolved considerably in recent years and today more options are available, offering greater longevity and durability, lowered costs, faster application and reduced impact on the environment. The fact that more options are available, however, means that more critical decisions must be made in order to ensure that the optimal solution is selected for the specific needs of each project. In this article we will look at some of the variables that should be considered, while examining the va
  • Stable site
    July 23, 2012
    A Wirtgen soil stabilisation machine has been treating a 100,000m2 site in Staffordshire for an advanced logistics centre, a project including access roads and parking areas. The WR2500S recycler is being used to prepare the way for the vast Blue Planet complex in Chatterley Valley, Newcastle-under-Lyme. Throughout the preliminary groundworks the Wirtgen machine, purchased by Barton Plant of Kettering, Northamptonshire, has placed between 6-7,000m2/day of lime/cement stabilised earth on the project, for mai
  • Ammann asphalt plant for UAE road construction
    October 5, 2018
    An asphalt plant supplied by Ammann is now playing an important role in the UAE’s road construction sector The plant is producing material for major new road projects in the UAE. “We need to produce quality asphalt, and high volumes of it,” said Adnan Elmasri, operations manager for Top Link Contracting & General Transportation, based in Dubai. Top Link, a major contractor in Abu Dhabi and Dubai, is providing mix for a new highway that will help to reduce the current traffic congestion issues occurring
  • Fast lifting with ClickLift
    May 14, 2020
    When the finish surface layer is being applied, the manhole cover can be raised with the ClickLift frame extender.