Skip to main content

Fast lifting with ClickLift

When the finish surface layer is being applied, the manhole cover can be raised with the ClickLift frame extender.
By David Arminas May 14, 2020 Read time: 2 mins
ClickLift raises Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing

It’s common practice for manhole covers to be installed in the early stages of a housing development, well before the final tarmac is laid. This means that the manhole cover is installed proud of the binding layer, but making it susceptible to construction traffic damage. Or, if installed level with the binding layer, it must be entirely dug out and effectively re-installed.

Both scenarios mean additional costs and potential complications.

To counter this, Wrekin Products has created ClickLift to raise Wrekin Highway and TriStar frames to suit the final surface layer without the need for digging out and re-installing. The cover and the frame are installed at the binding layer level to reduce the possibility of site damage.

When the finish surface layer is being applied, the manhole cover can be raised with the ClickLift frame extender, simply and quickly, explains Simon Gibson, technical director at Wrekin Products.

“When specifying covers for developments, we’ve also noticed that specifiers sometimes don’t consider the construction phase traffic and the impact of site vehicles on ironwork,” he says.

“The new product is kitemarked by BSi and is available with four fixed incremental depths – 30/40/50/60mm – for two clear openings – 600/675mm. It is designed for use with both Wrekin’s Highway manhole cover range and TriStar manhole cover range.”

Wrekin has a full range of geosynthetic solutions for ground stabilisation, reinforcement, erosion control, drainage and other environmental issues. The company, based in the UK, recently announced that its Unite series of manhole covers and gully tops now comes with a 10-year guarantee and that its products have been in service on highways around the UK for more than 11 years with zero failures on 250,000 installations.

Related Content

  • It's all about profit, people and the planet
    February 18, 2025
    Sit in on our latest roundtable discussion on sustainability in the construction and aggregates industries, brought to you by Global Highways and Aggregates Business. AB editor Guy Woodford has been talking to two world-class experts: Jeremy Harsin from Cummins and Michael Gomes from Topcon. Make your planning, your workflows, your contract tenders, and your sites as sustainable as possible. “Sustainability is really about profit, people and the planet,” say our experts. “Being able to drive that is the work that matters.”
  • World growth in geosynthtics set to rise
    February 17, 2012
    With geosynthetics sales set to grow rapidly in the next three years, manufacturers are preparing for the demand. Patrick Smith reports. Global demand for geosynthetics is projected to increase 5.3% annually to 4.7 billion m² in 2013 with countries such as China, India and Russia expected to post the strongest gains through the forecast period. All are building large-scale infrastructure developments and face evolving environmental protection regulations and strict building construction codes.
  • Plain sailing for Caterpillar’s PM 300 series
    February 22, 2019
    Caterpillar’s revamped small cold planers have upped the stakes in the urban refurbishing market. World Highways deputy editor David Arminas recently caught up with A.J. Lee, global segment manager, on Spain’s Costa del Sol
  • Reduced emissions, costs, with recycled asphalt
    February 21, 2012
    Recycling is a key issue for asphalt road construction, with many technologies now coming to market. Bith an ever increasing emphasis on sustainability forcing change in the construction sector in Europe and North America, the highway sector now has to seek new solutions.