Skip to main content

Surfaces made safe

Spanning Manahawkin Bay, and carrying traffic along Route 72 between Long Beach Island and Manahawkin, New Jersey, USA, the Dorland J. Henderson Memorial Bridge, known as the Manahawkin Bay Bridge, was in need of repair. New Jersey Department of Transportation (NJDOT) specified Transpo T-17 MMA polymer concrete patch and T-18 MMA polymer concrete slurry overlay as approved materials for the 12,000m² bridge rehabilitation project on the steel girder bridge. All the bridge deck spalls were prepared and patche
February 10, 2012 Read time: 3 mins
Spanning Manahawkin Bay, and carrying traffic along Route 72 between Long Beach Island and Manahawkin, New Jersey, USA, the Dorland J. Henderson Memorial Bridge, known as the Manahawkin Bay Bridge, was in need of repair.

2555 New Jersey Department of Transportation (NJDOT) specified 350 Transpo T-17 MMA polymer concrete patch and T-18 MMA polymer concrete slurry overlay as approved materials for the 12,000m² bridge rehabilitation project on the steel girder bridge.

All the bridge deck spalls were prepared and patched before the entire surface received a thin T-18 MMA overlay. After the removal of the deteriorated existing concrete, T-41 MMA primer was applied to seal the concrete surface and increase the bond strength of the T-17 MMA polymer concrete patches to the existing concrete surface.

When the patching was completed the last operation was the installation of a thin 9.5mm T-18 MMA polymer concrete slurry overlay, and a high-wear and skid-resistant aggregate was broadcast onto the overlay surface. When cured the entire surface was coated with T-18 MMA topcoat to help lock the aggregate into the overlay.

1394 Ennis Prismo Traffic Safety Solutions’ new Fibrescreed RC100MTR crack repair product has passed the technical assessment for crack repair systems for highways under the BBA HAPAS scheme (British Board of Agrément Highways, Highway Authorities Product Approval Scheme).

The assessment means that the product is now approved for use on all major asphalt major roads, motorways and bridges in the UK.

While the approval is for recessed crack repair, Ennis Prismo manufactures a range of Fibrescreed products that can be used for practically all types of crack repair, including kerb sealing, infill, saw cut and seal/crack inducer and SAMI (stress absorbing membrane interlayer).

Fibrescreed RC100MTR is said to reduce costs by extending the life of existing highways without the need for resurfacing, and because it is fast and easy to apply, keeps costly traffic disruption to a minimum.

Meanwhile, 2314 Stirling Lloyd has developed a range of high performance road maintenance products to improve safety for the contractor and road user, and “offer superior in situ performance with a longer service life.” The company’s Safetrack Crack Infill, Safetrack Overbanding and Ultrajoint systems (bitumen-free, liquid, cold applied, fast-curing reactive resin systems for sealing and repairing cracks) are also HPAS Road and Bridges approved.

Stirling Lloyd says that the provision of safer and reliable traffic flows has become a matter of major concern for both the highway authorities and the road users.

“The need for reliable, long-term, safety enhancing road repairs with fast, first-time permanent reinstatement is becoming the driving force in highways maintenance,” says the company.

For more information on companies in this article

Related Content

  • Stirling Lloyd in the fast lane: Waterproofing Warsaw’s Rowecki Bridge
    January 19, 2016
    Warsaw’s General Stefan Rowecki Bridge, or the Grota Bridge, is the second largest in the Polish capital and, as part of the Trasa Toruska expressway, it is the busiest. The structure, which opened in 1981, handles 150,000 cars daily, so repairs were always going to be tricky if minimal disruption to traffic was to occur. The steel orthotropic deck consists of two structurally independent parts – each with four traffic lanes. This meant that pedestrians and cyclists were restricted to two very narrow track
  • Pothole and marking options
    February 21, 2012
    Ennis Prismo Traffic Safety Solutions now has a quick solution to pothole patching problems and temporary road marking needs.
  • Irish orders for special surfaces
    February 6, 2012
    Over the past few months, Lagan Construction, the primary partner of Ennis Prismo Traffic Safety Solutions in Ireland, has secured contracts to install more than 60,000m² of the international road marking manufacturer's high-friction road surfacing materials. The contracts were awarded following earlier trials using Ennis Prismo's BBA-HAPAS [British Board of Agrément-The Highways Authorities Product Approval Scheme]-approved Type 1 material Tyregrip on trial sites for Ireland's National Roads Authority (NRA
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.