Skip to main content

Paving underground

A Power Curbers 5700C machine is being used underground in Turkey to slipform the U-shaped concrete platforms on the walls of a new tunnel project.
February 14, 2012 Read time: 1 min
A 307 Power Curbers 5700C machine is being used underground in Turkey to slipform the U-shaped concrete platforms on the walls of a new tunnel project. These will house electrical conduit and serve as maintenance walkways when the tunnel is in operation.

This machine is working on a railway tunnel that forms part of a new link in Turkey's commercial centre Istanbul. This link is intended to reduce chronic traffic congestion that occurs particularly at peak periods on the crowded D100 highway that runs East-West on the Asian side of the city. The machine is working around 45m underground and has been fitted with a special 4.5tonne mould designed for this job. The job is challenging in several ways and aside from having to deliver concrete through chutes placed into the tunnel every few kilometres, securing the concrete to tunnel walls that vary in diameter has presented a real challenge. The tunnel walls are wider at train stations and then become narrower again, so Power Curbers designed a mould that can be varied hydraulically in both height and width.

For more information on companies in this article

Related Content

  • Innovations in formwork aid project completion
    February 14, 2012
    Innovative formwork solutions are helping to get projects completed on or before time, meaning savings in time and money as Patrick smith reports. The use of flexible, modular formwork to create innovative structures out of concrete is helping to increase productivity and thus drive down completion time and costs.
  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Concrete paving key to Berlin's airport runways
    February 17, 2012
    High production concrete paving is proving a key feature at the new Berlin airport facility currently under construction The new Berlin-Brandenburg International Airport will soon provide improved links by air to the city. Work started in mid 2006 with the redevelopment of the existing Berlin Schönefeld Airport.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s