Skip to main content

Paving underground

A Power Curbers 5700C machine is being used underground in Turkey to slipform the U-shaped concrete platforms on the walls of a new tunnel project.
February 14, 2012 Read time: 1 min
A 307 Power Curbers 5700C machine is being used underground in Turkey to slipform the U-shaped concrete platforms on the walls of a new tunnel project. These will house electrical conduit and serve as maintenance walkways when the tunnel is in operation.

This machine is working on a railway tunnel that forms part of a new link in Turkey's commercial centre Istanbul. This link is intended to reduce chronic traffic congestion that occurs particularly at peak periods on the crowded D100 highway that runs East-West on the Asian side of the city. The machine is working around 45m underground and has been fitted with a special 4.5tonne mould designed for this job. The job is challenging in several ways and aside from having to deliver concrete through chutes placed into the tunnel every few kilometres, securing the concrete to tunnel walls that vary in diameter has presented a real challenge. The tunnel walls are wider at train stations and then become narrower again, so Power Curbers designed a mould that can be varied hydraulically in both height and width.

For more information on companies in this article

Related Content

  • Chile’s new urban highway link
    May 2, 2022
    Nestling in a valley beside the Andes mountain range, Santiago has a growing population and has suffered from increasingly heavy congestion in recent years, requiring a new urban road link for which safety has been set as a priority for drivers - *iRAP reports
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon
  • Innovations in crushing and screening technology boosting efficiency
    July 15, 2015
    The crushing and screening sector has seen a flurry of new model launches in recent months, with a series of new equipment introductions - Mike Woof writes. Crushing and screening systems play a vital role in the overall cost effectiveness of a quarrying operation. Ensuring that a quarry runs efficiently relies heavily on the appropriateness of the entire crushing and screening set-up for the material input, the output grades and the compatibility of each separate unit. Mobility has been a key issue in rece
  • Traffic control to beat congestion
    November 6, 2012
    Max Lay discusses how congestion has posed problems throughout history from early civilisation to the present day One of the earliest known human settlements was at the Springs of Elisha at Jericho. Inevitably, locals collecting fresh water from the springs would encounter other water carriers. When a path was too narrow, or access to it was too limited, or it crossed another path, some carriers would find it necessary to stand aside for others. Priority in such cases might be based on common courtesy and p