Skip to main content

A solution for Michigan road repairs

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 3M. The special concrete features a mixture that is better able to withstand the freez
May 22, 2018 Read time: 2 mins

Roads all over the US state of Michigan are in desperate need of repair, but cities do not always have enough money to fix them. However, the city of Jackson could help pave the way toward a solution. An project on a small street in Jackson could help communities across the state in the future. Lydia Street connects Wildwood with Michigan Avenue near downtown Jackson and has been repaired using a new product from supplier 152 3M. The special concrete features a mixture that is better able to withstand the freeze-thaw cycle, which is at the root of many of Michigan’s road problems. The novel mix benefits from a combination of stronger materials and more oxygen. Comprising finely crushed granite, the material is said to ensure a greater stability during curing, leading to improved durability. Should the trial of this new solution go to plan, Michigan Department of Transport (MDOT) will begin using the material more widely across the state. The material is expected to cut costs considerably in the future, due to its extended life in the tough climate.

For more information on companies in this article

Related Content

  • Another US$94.08mn for repairs to Hammersmith flyover in London
    June 14, 2013
    A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
  • Bitumen technology: crude moves and carbon savings for the industry
    July 11, 2022
    As bitumen suppliers look to replace Russian sources of crude oil, there’s a race to get biogenic asphalts to market – and bank those carbon-saving benefits - Kristina Smith writes
  • Rare Indian red granite extracted from village quarries
    June 25, 2013
    Rare Indian red granite is being extracted from four granite quarries across 24hectares of land in the south Indian villages of Purthagere and Kadur According to legend, Ilkal granite (also known as Cat’s Eye granite) was first discovered 2,000 years ago, but remained a little known rarity for two millennia. This all changed in 1983 when rich deposits were discovered in a small corner of south-west India, allowing Ilkal granite to be exploited for its beauty and decorative worth.
  • US bridges needing repair or replacement
    September 13, 2024
    Nearly 221,800 US bridges are needing repair or replacement.