Skip to main content

Quick concrete repair to airport facilities

Riga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades.
April 10, 2012 Read time: 1 min
RSSRiga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades. The number of passengers in May 2011 showed an increase of 12% to 478,423 compared to May 2010. With hundreds of flights leaving daily some concrete needed repairing at the airport. Construction Projects Manager at Riga International Airport, Guntis Skangalis opted to use Ultrascape Pro-Prime Slurry Primer and Ultracrete FTC High Strength Concrete Repair for the completion of the project. This followed a presentation held by 2819 Delta Urban, distributors of Ultracrete Highway Maintenance and Ultrascape Streetscape materials. Once the damaged concrete had been prepared using a hydraulic hammer, Ultrascape Pro-Prime Slurry Primer was applied. Ultracrete FTC High Strength Concrete Repair was then prepared. The project was completed on time and with minimum disruption to passengers and employees.

For more information on companies in this article

Related Content

  • Asphalt paving trial for mat quality using MTVs
    December 8, 2015
    An asphalt paving trial at Rome Airport tested mat quality with and without the use of MTVs Rome’s airport Fiumicino or the Leonardo da Vinci Airport of Rome is one of Europe’s busiest airports and lies 25.6km southwest of the city, a 30-minute train ride away.
  • Durability is crucial while warm mix technology can help disaster recovery
    February 21, 2013
    Why durability is crucial for both emerging and developed economies, and how warm mix technology can help disaster recovery - Kristina Smith reports. When CORE Construction, a 100% owned Ghanaian company, started working on road construction projects five years ago, it was difficult to source the right bituminous mixes. “In the past, most construction firms had a number of challenges when it came to bituminous works, since the local capacity was not well-developed,” said CORE CEO Frank Lartey. CORE’s soluti
  • Atlanta airport’s new apron
    October 12, 2012
    The new Maynard H Jackson Jr International Terminal at Hartsfield- Jackson Atlanta International Airport is now open for business. The 111,484m2 terminal features 12 gates, eight security checkpoints, separate levels for arrivals and departures, as well as a 148,831m2 concrete apron for aircraft to park on arrival. Archer Western won the contract to slipform the concrete apron, replace the existing Taxiway D, as well as other utilities and embankment work. The firm brought in one of its GOMACO paving trains
  • G&Z launching new concrete placer
    March 3, 2015
    New material placer being introduced by G&Z – Mike Woof writes. Guntert & Zimmerman is now lifting the wraps from its new MP550 material placer, having announced last year that design work was underway. This machine is designed to boost throughput and overall productivity on site, while being versatile, easy to maintain and service and offering low running costs. According to the firm, the MP550 is the most versatile material placer on the market as it can handle a wide variety of concrete slumps as well as