Skip to main content

Quick concrete repair to airport facilities

Riga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades.
April 10, 2012 Read time: 1 min
RSSRiga International Airport in Latvia is seeing growth in aircraft numbers and passengers, prompting a need for investment and upgrades. The number of passengers in May 2011 showed an increase of 12% to 478,423 compared to May 2010. With hundreds of flights leaving daily some concrete needed repairing at the airport. Construction Projects Manager at Riga International Airport, Guntis Skangalis opted to use Ultrascape Pro-Prime Slurry Primer and Ultracrete FTC High Strength Concrete Repair for the completion of the project. This followed a presentation held by 2819 Delta Urban, distributors of Ultracrete Highway Maintenance and Ultrascape Streetscape materials. Once the damaged concrete had been prepared using a hydraulic hammer, Ultrascape Pro-Prime Slurry Primer was applied. Ultracrete FTC High Strength Concrete Repair was then prepared. The project was completed on time and with minimum disruption to passengers and employees.

For more information on companies in this article

Related Content

  • More Saudi airport capacity
    October 12, 2012
    A major expansion programme is underway at King Abdulaziz International Airport in Jeddah, Saudi Arabia. The work started in the third quarter of 2006 and is due for completion in 2015, with the construction activity being carried out in three main stages. Once the work is complete the airport will be able to handle up to 80 million passengers/ year, compared with 13 million/year before construction commenced. The project also includes three new terminal buildings and a high-speed rail link, as well as airf
  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Versatile concrete paving machines
    July 13, 2012
    Concrete paving machines from Guntert & Zimmerman have been carrying out important surface repair jobs around the world. In Belgium a paver from the firm recently completed a high speed road repair, while at Qatar's New Doha International airport one of the firm's S850 units has carried out a major apron paving contract. The new airport is being designed to cope with large passenger aircraft such as the Airbus A380 and the Sinohydro-Gamuda-WCT joint venture was awarded the contract to build two runways, thr
  • Technology helps earth moving and paving
    August 18, 2014
    Located in Meeker, Colorado and serving the area for air transportation is Meeker Airport, a C-II general aviation airport. The FAA designation of C-II means the airport can accommodate aircraft with wingspan of less than 24m. Runway 3-21 at the Rio Blanco county-owned Meeker Airport had reached a point of wear and deterioration that required full reconstruction and upgrades to remain compliant with the FAA’s C-II requirements.