Skip to main content

Doka Group acquires Dutch technology specialist BAS

Austrian formwork specialist Doka has acquired Dutch construction materials research company. Around 40 people work at BAS, based in Venlo, Netherlands, which was set up in 1979 to researching and develop materials used in the construction industry, particularly concrete.
September 16, 2016 Read time: 1 min

Austrian formwork specialist 203 Doka has acquired Dutch construction materials research company.

Around 40 people work at BAS, based in Venlo, Netherlands, which was set up in 1979 to researching and develop materials used in the construction industry, particularly concrete.

Doka is a formwork developer and manufacturer and part of the Umdasch Group based in Amstetten, Austria. Doka has a worldwide workforce of more than 6,000.

The acquisition comes after several years of cooperation between the two companies. "We've been working successfully with BAS for several years,” said Jürgen Obiegli, chairman of Doka Group and who sealed the deal.

“Concremote, a sensor-based technology for measuring strength development in concrete and for identifying the ideal time for stripping the formwork, was one of the absolute highlights at this year's bauma expo.”

BAS has focused its research and development activities on material use from the planning stage through to demolition and waste disposal and has its own concrete laboratories in the Netherlands.

For more information on companies in this article

Related Content

  • Intelligent monitoring of concrete pours cuts time on site
    April 12, 2016
    Intelligent monitoring of concrete strengths is helping contractors shave weeks off construction programmes, according to formwork specialist Doka. Its Concremote system measures the temperature of the concrete, converts that to predicted strength and allows the contractor to strike the formwork when the concrete is ready – rather than waiting for a set number of days. “Concretemote is being used on 20 to 25 projects,” said Doka’s director of research and development Johann Peneder.
  • Doka’s Concremote gives exact measurement for accurate control
    March 3, 2016
    Doka’s Concremote makes it possible to measure concrete strength on the site and in real time. It uses the weighted maturity method, as developed by de Vree, to provide reliable, standards-compliant information on the strength development of the concrete. This facilitates targeted management of the forming and CIP concreting operations. The advantage of the method is the measurement take place directly in the concrete element. With well-placed sensors - thermos-couples - the temperature can easily be mea
  • Doka’s Concremote gives exact measurement for accurate control
    January 6, 2017
    Doka’s Concremote makes it possible to measure concrete strength on the site and in real time. It uses the weighted maturity method, as developed by de Vree, to provide reliable, standards-compliant information on the strength development of the concrete. This facilitates targeted management of the forming and CIP concreting operations. The advantage of the method is the measurement take place directly in the concrete element. With well-placed sensors - thermos-couples - the temperature can easily be mea
  • Doka wins Fehmarnbelt Tunnel formwork deal
    November 17, 2022
    When completed in 2029, the Fehmarnbelt Tunnel between Denmark and Germany will accommodate a four-lane highway, as well as a two-track electrified rail line.