Skip to main content

Efficient concrete overlays

Concrete overlays have a long history and proven success in the state of Iowa. Mitchell and Worth counties in north central Iowa have led the way. In the past three years, they have put down approximately 241km of 102mm concrete overlay. Concrete Foundations Inc. (CFI), based out of Hiawatha, Iowa, has slipformed almost 80km of the counties' overlays, including 45km this paving season near the town of Osage. CFI has slipformed most of the overlays with its GOMACO two-track GP-2600 paver. This season, the co
February 15, 2012 Read time: 2 mins
Efficient concrete overlays are being achieved with the use of stringless controls

Concrete overlays have a long history and proven success in the state of Iowa. Mitchell and Worth counties in north central Iowa have led the way. In the past three years, they have put down approximately 241km of 102mm concrete overlay.

Concrete Foundations Inc. (CFI), based out of Hiawatha, Iowa, has slipformed almost 80km of the counties' overlays, including 45km this paving season near the town of Osage.

CFI has slipformed most of the overlays with its 218 Gomaco two-track GP-2600 paver. This season, the company added the Leica Geosystems stringless system and a new GOMACO four-track GHP-2800 paver to the inventory. Both were put to work on the project near Osage.

The new unbonded concrete overlay is 6.7m wide, and the material is placed directly on the existing asphalt surface of the roadway. The surface only has to be swept clean before the mix is dumped on it and concrete slump averages around 13-25mm.

The firm has seen increased production with fewer people needed for stringline maintenance and setup. Five site personnel who normally worked with the stringline are now used elsewhere during the paving process. The lack of stringline also allows them to focus more on quality and production rather than stringline maintenance.

The GOMACO GHP-2800 is pulling burlap for a burlap drag finish behind the paver. Finishers work behind the paver with bull floats before a texture/cure machine applies a longitudinal tine and white spray cure.

For more information on companies in this article

Related Content

  • Vögele’s new compact asphalt paver offers sophistication
    January 6, 2017
    Vögele says that its SUPER 800-3i is compact and versatile, offering a range of pave widths extends from 0.5-3.5m. The machine can operate in confined spaces such as in towns and cities and suits duties with local authority contractors. Of note is that it has an AB 220 TV screed, a tamper vibrating model that is unusual in this compact asphalt paving class as competing models tend to feature vibration only.
  • Innovations introduced to optimise milling
    September 28, 2015
    New developments for the milling machine sector should help optimise performance, as well as increase health and safety standards for site personnel Advances in the milling machine market generally focus on new models being available or developments to drums and cutters. However some rather different developments are taking place that could well deliver long-term improvements for health and safety as well as the quality of work carried out, optimising milling operations. Earlier this year, new guideli
  • Sandvik’s Korean roots
    June 14, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.
  • Sandvik’s Korean roots
    June 13, 2012
    Sandvik has supplied an aggregate plant to the DooWon Development Company to process granite at its Jungeub quarry in JeonRa province, South Korea. The supplied equipment is processing blasted rock from a feed size of -900mm in order to produce aggregate for the Korean construction industry, with the product fractions ranging from 0-5mm to 13-25mm, at a required rate of production of 500tonnes per hour.