Skip to main content

New surface for Dubai’s busy airport

Dubai’s busy international airport is now benefiting from new runway and taxiway areas that will help boost capacity. The upgrades are much needed as the airport is one of the world’s busiest in terms of international flights. Data from the International Air Transportation Association (IATA) says that in 2013, air passenger traffic worldwide topped 3.1 billion, and demand is expected to continue to grow. The combination of more flights and growing numbers of larger and more sophisticated aircraft like the A
January 6, 2015 Read time: 2 mins
Dubai’s international airport now has new runway surfaces with bitumen having been supplied by Shell Bitumen

Dubai’s busy international airport is now benefiting from new runway and taxiway areas that will help boost capacity. The upgrades are much needed as the airport is one of the world’s busiest in terms of international flights.

Data from the International Air Transportation Association (IATA) says that in 2013, air passenger traffic worldwide topped 3.1 billion, and demand is expected to continue to grow.

The combination of more flights and growing numbers of larger and more sophisticated aircraft like the Airbus A380 means that the world’s busiest international airports are having to redevelop their runways and taxiways. The Airbus A380 weighs close to 400tonnes and landings of this huge aircraft can place enormous stresses on runway structures.

As a result, special techniques and materials are required to build the runways to ensure that they can cope with the immense engineering loads exerted.

When Dubai International Airport required its two runways to be upgraded and resurfaced in May 2014, 763 Shell Bitumen was approached by contractor Al Naboodah Construction Group to provide special bitumen solutions for this logistically challenging project. The company was able to provide special bitumen technologies to meet the demands of the project. In the past, Shell Bitumen has provide materials for use on other major airports, including Heathrow in the UK, Charles de Gaulle in France, Schiphol in the Netherlands, HKIA in Hong Kong, Changi in Singapore, KLIA in Malaysia, Frankfurt in Germany and Suvarnabhumi in Thailand.

For more information on companies in this article

Related Content

  • Rome airport taxiway rebuild work
    May 5, 2020
    Rome airport taxiway has benefited from rebuilding work.
  • Speedy airport upgrade
    February 15, 2012
    Increases in flight numbers from the Frankfurt Hahn airport have resulted in necessary improvements to the facility, including new runway surfaces. The former German military airbase has been used as a civilian airport since 1993 but is now Germany's fifth largest air cargo hub and handles some 40,000 flights/year.
  • Shell Bitumen’s new technology cuts air-polluting emissions by 40%
    May 15, 2019
    Shell Bitumen has developed molecular technology that cuts 40% of air-polluting emissions -Kristina Smith reports Shell Bitumen is launching a new technology which drastically reduces the amount of harmful air pollutants produced when asphalt mixes are manufactured and laid on the roads. Called Shell Bitumen FreshAir, it reduces six of the seven pollutants produced by at least 40%. The seventh, ozone, is produced in too small an amount to measure changes. “The World Health Organisation has said that 90%
  • Hamburg-Finkenwerder airport has new runway surface
    August 21, 2013
    Hamburg’s Finkenwerder airport is now benefiting from a new runway surface following work carried out by contractor KEMNA BAU. The company recently used machines from Dynapac to resurface 36,000m2 of the runway track in Hamburg-Finkenwerder, a facility used by Airbus. The airport handles around 10-15 take-offs and landings/day when aircraft are either undergoing flight testing or being delivered to customers, as well as for deliveries of components by transport aircraft. The project was tricky as the