Skip to main content

New surface for Dubai’s busy airport

Dubai’s busy international airport is now benefiting from new runway and taxiway areas that will help boost capacity. The upgrades are much needed as the airport is one of the world’s busiest in terms of international flights. Data from the International Air Transportation Association (IATA) says that in 2013, air passenger traffic worldwide topped 3.1 billion, and demand is expected to continue to grow. The combination of more flights and growing numbers of larger and more sophisticated aircraft like the A
January 6, 2015 Read time: 2 mins
Dubai’s international airport now has new runway surfaces with bitumen having been supplied by Shell Bitumen

Dubai’s busy international airport is now benefiting from new runway and taxiway areas that will help boost capacity. The upgrades are much needed as the airport is one of the world’s busiest in terms of international flights.

Data from the International Air Transportation Association (IATA) says that in 2013, air passenger traffic worldwide topped 3.1 billion, and demand is expected to continue to grow.

The combination of more flights and growing numbers of larger and more sophisticated aircraft like the Airbus A380 means that the world’s busiest international airports are having to redevelop their runways and taxiways. The Airbus A380 weighs close to 400tonnes and landings of this huge aircraft can place enormous stresses on runway structures.

As a result, special techniques and materials are required to build the runways to ensure that they can cope with the immense engineering loads exerted.

When Dubai International Airport required its two runways to be upgraded and resurfaced in May 2014, 763 Shell Bitumen was approached by contractor Al Naboodah Construction Group to provide special bitumen solutions for this logistically challenging project. The company was able to provide special bitumen technologies to meet the demands of the project. In the past, Shell Bitumen has provide materials for use on other major airports, including Heathrow in the UK, Charles de Gaulle in France, Schiphol in the Netherlands, HKIA in Hong Kong, Changi in Singapore, KLIA in Malaysia, Frankfurt in Germany and Suvarnabhumi in Thailand.

For more information on companies in this article

Related Content

  • A new runway surface for a major airport in Indonesia
    August 12, 2020
    Major rebuilding work has been carried out at Minangkabau International Airport (PDG), while the New Yogyakarta International Airport (NYIA) has been built in Indonesia.
  • Airport upgrade
    July 2, 2012
    Four Dynapac CA602D single drum soil compactors are helping redevelopment work at Muscat International Airport in Oman. The machines are compacting around 160,000m2 of rockfill as part of a project to increase the airport's passenger handling capacity from 5-12 million/year by 2011. To minimise runway or taxiway flooding risks, the grounds are being raised 3m by local contractor Galfar Engineering & Contracting SAOG and this requires 10-12 million m3 of desert sand and crushed rock. The 19tonne Dynapac roll
  • Major upgrade for Chicago O’Hare Airport
    August 14, 2015
    Internationally, airports are being upgraded and expanded to increase capacity and safety – Mike Woof writes. All around the world, airports are being expanded and upgraded, both to cope with massive increases in passenger numbers and also to handle larger aircraft. Runways have to be rebuilt with stronger structures and surfaces to handle greater air traffic volumes as well as increased loads from larger aeroplanes. Building airport runways, however, poses many challenges for construction crews. Paving qua
  • Benin airport job for Topcon’s RD-M1 scanner
    May 13, 2022
    A $16 million runway project at Cotonou Cadjehoun Airport needed Topcon Positioning’s RD-M1 road scanner to ensure precise milling and quality resurfacing.