Skip to main content

Removing runway rubber

When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges.
February 20, 2012 Read time: 2 mins
When Dubai Airport contacted Waterblasting Technologies it faced a number of challenges.

One was finding a waterblasting system that would operate successfully in the 42º-52ºC daylight heat of the summer and also to find the fastest and most productive waterblasting system because of very limited runway closure time.

Chemicals, shotblasting and other waterblasting equipment had been tried on the runways, but eventually engineers and management chose the Stripe Hog SH8000T manufactured by 362 Waterblasting Technologies.

The system, which can be built on a variety of truck chassis, uses needle sharp water jets to quickly remove all types of roadway and airfield marking paint as well as runway rubber deposit build-up.

According to the company the Dubai airport runways is probably the most challenging rubber removal environment in the world with an average of 800-plus movements a day with summer-time peaks of 1,100/day and an average of only 5-10 days of rain each year.

"With the ability to remove runway rubber deposits on average of 1,672m²/hour and the ability to operate in the extreme heat without breaking down, the SH8000T became the product of choice for the Dubai airport," says Waterblasting Technologies, which also offers the SH8000T or the new SH8000R with optional, on-board water recycling.

For more information on companies in this article

Related Content

  • Crushing and screening for producing and re-using
    July 23, 2012
    The recycling and minerals extraction markets now share technologies, Mike Woof reports Not surprisingly, the Steinexpo quarrying event in Germany was a key launch venue for new crushing and screening technologies, as well as associated quarrying technology. Crushing and screening equipment firms from a wide range of European countries including Austria, the Czech Republic, Germany, Ireland, Italy, Sweden, Switzerland and the UK were present at the exhibition. However it was noticeable how closely the miner
  • Developments in compact asphalt compaction
    February 20, 2012
    An array of new models has increased competition in the market for compact asphalt compaction products - Mike Woof reports
  • Quarry operators improve on productivity
    February 13, 2012
    With capital expenditure plans being reduced, many quarry operators are using the funds available to improve on productivity with their existing equipment fleets. Claire Symes reports. The economic downturn has had a big impact on the aggregates production sector with many quarry operators looking to reduce costs and rationalise operations. The impact of this can be seen in the reduction of capital expenditure plans but the investments that are being made are focused on efficiency.
  • Volvo CE machines boost output for US quarry
    June 28, 2018
    At Savage Stone’s 161.9ha quarry in Jessup, Maryland, gabbro is extracted from five 13.1m-tall benches, with chemical rock hardness increasing with each lower level. The shot rock (similar to granite and good for coarse road base) used to be loaded into Volvo 31tonne and 36tonne capacity articulated haulers and 90tonne capacity Euclid rigid haulers and transported 800m uphill to the primary crusher, a Lippmann 5062 jaw crusher. The jaw crusher processes rock to 127-178mm, which is then stockpiled on the s