Skip to main content

Paving on Algeria's mega highway

A fleet of 53 Dynapac machines is being used by a Chinese consortium to build the central and western sections of the 1,216km Algerian East-West Expressway. The consortium comprises CITIC and CRCC and was awarded the contract for the 169km central and 359km western sections of highway.
March 1, 2012 Read time: 2 mins
Craig Walker with staff from the Jiangsu Transportation Research Institute (JSTRI) after training on Cooper Technology equipment at the central testing lab in Oran, Algeria
A fleet of 53 206 Dynapac machines is being used by a Chinese consortium to build the central and western sections of the 1,216km Algerian East-West Expressway.

The consortium comprises CITIC and CRCC and was awarded the contract for the 169km central and 359km western sections of highway.

To help meet the tight schedule, tough conditions and remote locations, CITIC-CRCC opted to buy equipment from Dynapac. The new Dynapac fleet comprises 20 F141C pavers; a F182CS paver; 18 CC624HFs and 14 CC622HF tandem rollers. The machines are being used to pave and compact the base course, binder course and wearing course.

French asphalt mixtures and testing procedures have been specified, and the testing laboratories were equipped with large wheel trackers, automatic large roller compactors, trapezoidal bending machines and Duriez testing machines. Among those supplying equipment is UK company 5941 Cooper Technology.

"The French asphalt mixture design method is an advanced, performance-based asphalt mixture design method. French asphalts such as EME2 are expensive due to a bitumen content which is around 1% higher than in conventional mixes, but prove cost effective in terms of life cycle cost analysis," said Mr Jia Yu, Vice Chief Engineer at the Jiangsu Transportation Research Institute in China.

For high modulus asphalt concrete mixture, there are two categories: EME is used in base course and BBME is used in binder and surface course. The two materials are both used in the Algeria East-West Expressway with a wearing course of BBMA.

For more information on companies in this article

Related Content

  • Dynapac introduces new CC1600 compactor
    January 6, 2017
    Dynapac is introducing the CC1600 tandem roller for asphalt which features a state-of-the-art drivers’ platform and a water-cooled engine. It has vibratory drums as wide as 1,600mm, and is engineered primarily for asphalt compaction on streets and pavements in urban areas. It is also suitable for compacting sub-bases and base courses, and is adequate to follow a compact paver.
  • Dynapac introduces new CC1600 compactor
    February 13, 2013
    Dynapac is introducing the CC1600 tandem roller for asphalt which features a state-of-the-art drivers’ platform and a water-cooled engine. It has vibratory drums as wide as 1,600mm, and is engineered primarily for asphalt compaction on streets and pavements in urban areas. It is also suitable for compacting sub-bases and base courses, and is adequate to follow a compact paver.
  • Cold climate binder selection, a tricky business
    May 16, 2017
    Binder selection in cold climates is especially critical for extended pavement life, as Robert Otto Rasmussen, vice president and chief engineer of Transtec Group, explains. The cold climate found in regions such as Canada and the northern regions of the US and Europe poses a particular challenge to engineering a long-lasting, high-quality pavement. Pavements constructed with asphalt in those regions are affected by the asphalt binder’s sensitivity to temperature. Choosing a binder wisely is imperative for
  • Runway rebuild for key Bulgarian airport
    August 21, 2013
    Varna Airport in north-east Bulgaria provides an important international link for the country, with a runway rebuild helping improve capacity. The airport is of particular importance for Bulgaria’s tourist trade as it provides a major connection for visitors to the Black Sea coast. And the reconstruction work at Varna Airport’s only runway will ensure the facility is able to handle the area’s increasing visitor numbers. The project had to be carried out quickly and efficiently to prevent delays to f