Skip to main content

Paving on Algeria's mega highway

A fleet of 53 Dynapac machines is being used by a Chinese consortium to build the central and western sections of the 1,216km Algerian East-West Expressway. The consortium comprises CITIC and CRCC and was awarded the contract for the 169km central and 359km western sections of highway.
March 1, 2012 Read time: 2 mins
Craig Walker with staff from the Jiangsu Transportation Research Institute (JSTRI) after training on Cooper Technology equipment at the central testing lab in Oran, Algeria
A fleet of 53 206 Dynapac machines is being used by a Chinese consortium to build the central and western sections of the 1,216km Algerian East-West Expressway.

The consortium comprises CITIC and CRCC and was awarded the contract for the 169km central and 359km western sections of highway.

To help meet the tight schedule, tough conditions and remote locations, CITIC-CRCC opted to buy equipment from Dynapac. The new Dynapac fleet comprises 20 F141C pavers; a F182CS paver; 18 CC624HFs and 14 CC622HF tandem rollers. The machines are being used to pave and compact the base course, binder course and wearing course.

French asphalt mixtures and testing procedures have been specified, and the testing laboratories were equipped with large wheel trackers, automatic large roller compactors, trapezoidal bending machines and Duriez testing machines. Among those supplying equipment is UK company 5941 Cooper Technology.

"The French asphalt mixture design method is an advanced, performance-based asphalt mixture design method. French asphalts such as EME2 are expensive due to a bitumen content which is around 1% higher than in conventional mixes, but prove cost effective in terms of life cycle cost analysis," said Mr Jia Yu, Vice Chief Engineer at the Jiangsu Transportation Research Institute in China.

For high modulus asphalt concrete mixture, there are two categories: EME is used in base course and BBME is used in binder and surface course. The two materials are both used in the Algeria East-West Expressway with a wearing course of BBMA.

For more information on companies in this article

Related Content

  • High speed highway repair
    February 29, 2012
    A high speed highway rehabilitation has seen the repaving of a 1.5km stretch of road in just two night shifts. A Vögele SUPER 1800-2 paver fitted with one of the firm's SprayJet modules helped boost productivity and cut operating costs for Dutch contractor MNO Vervat.
  • Construction commencing on Algerian highway
    May 6, 2015
    A consortium comprising four contractors is carrying out construction of Algeria’s new Tizi-Hacine road link. The 18km road project in Mascara Province is costing US$205.34 million to build. The project is for the second part of the highway linking Mascara to the East-West motorway. The consortium comprises four Spanish-Algerian companies including Sarl Benzamia, Irrigout, CHM and LIC. Meanwhile work on the 25km stretch of road linking Hacine to the East-West highway is also commencing. This work is to be c
  • Partnering up for more Z.ERA performance
    August 1, 2023
    Together, Dynapac and Skanska brought all their combined expertise and engineering passion to the table for the development of the Z.ERA CC900 e tandem vibratory roller. Two years and zero emissions later, we had a look at how it has been received by Skanska personnel.
  • Electric paving becoming a reality
    July 21, 2025
    Electric asphalt paving machines are becoming a reality – Mike Woof writes