Skip to main content

High speed highway repair

A high speed highway rehabilitation has seen the repaving of a 1.5km stretch of road in just two night shifts. A Vögele SUPER 1800-2 paver fitted with one of the firm's SprayJet modules helped boost productivity and cut operating costs for Dutch contractor MNO Vervat.
February 29, 2012 Read time: 3 mins
Compaction equipment from Hamm was used to complete the surface work carried out by the Vögele paver
A high speed highway rehabilitation has seen the repaving of a 1.5km stretch of road in just two night shifts. A 1194 Vögele SUPER 1800-2 paver fitted with one of the firm's SprayJet modules helped boost productivity and cut operating costs for Dutch contractor 1642 MNO Vervat. The contract was the first time that the paving team had used its new Vögele SUPER 1800-2 with SprayJet Module in the Netherlands and has been used on a highway upgrade on the A6 near Amsterdam. The team quickly learned the operation of the machine and as surface upgrade was to be carried out by a thin overlay paved on spray seal, hot on hot, the paver applied emulsion and laid asphalt in one pass.

The A6 stretches from Amsterdam to Heerenveen in the north of the country and the surface course needed replacing for a 1.5km section to the north of Amsterdam. The first step involved milling off 20mm of the old surface between the Almeerderzand and Almere-Stad-West junctions using a 2395 Wirtgen planer fitted with a fine milling drum, before the new surfacing was to be paved.

This approach was used as the contractor, MNO Vervat, had convinced the authorities that using the Microville material for a thin overlay, with spray seal, hot on hot, was an effective solution. M Zwaan of the Dutch Ministry of Transport is responsible for road construction in the Amsterdam region and explained, "We wanted a low-budget rehabilitation of the motorway section, as a longer stretch of the A6 will undergo reconstruction in about 2-3 years' time. The offer submitted for paving the thin overlay was €500,000 cheaper than for conventional methods of pavement rehabilitation."

The paving team had just two nights to lay new surface course and the three lanes being resurfaced had an overall width of 15m while around the two junctions, the maximum width was 24m. All told, 30,000m2 of asphalt pavement needed rehabilitating. For the right-hand and middle lanes, the paving team used the paver's maximum pave and spray width. And when paving in 6m width, the operating speed of the SUPER 1800-2 with SprayJet Module was a productive 12m/min.

A key advantage of the SprayJet concept system is its ability to apply emulsion and paving asphalt in a single pass, a major benefit when paving thin overlays, hot on hot.

For thin overlays, compaction is a focal issue when it comes to producing a strong and durable bond of layers and this job was handled by a team of three 228 Hamm rollers. Two DV 70 OV tandem rollers compacted the surface, while MNO Vervat used a HW 90 to compact the transition areas. All three rollers operated in static mode and the final density of the 20mm overlay was achieved in just a few passes. The warranty period for the surface is five years although the contractor is convinced this will last considerably longer.

For more information on companies in this article

Related Content

  • German Autobahn receives new concrete surface
    September 11, 2014
    Precision paving performance has been achieved on a major road project in Germany, using Wirtgen slipform pavers. The SP1500 and SP1500L models have been used to help upgrade a stretch of the BAB A9 Autobahn in Thuringia. The BAB A9 Autobahn is one of Germany’s most important roads, connecting the German cities of Berlin and Munich over a total distance of 529km. The route runs from Brandenburg through Saxony-Anhalt, Saxony, Thuringia and into Bavaria.
  • Milling and paving for a highway repair in Oklahoma
    April 5, 2017
    Milling and paving work has helped restore the road surface on an important stretch of highway in the US state of Oklahoma. US Highway 62 is a key route, running 3,597km from to Niagara Falls, New York, at the Canada–US border to the Mexico-US border at El Paso in Texas. It is the only east-west United States numbered highway that connects Canada with Mexico through the US, making it a key transport route. A 12km section of US 62 where it runs through Oklahoma recently benefited from a much-needed rebuild,
  • Podium finish for Indonesia’s new racetrack paver
    November 23, 2021
    The first machines to complete a circuit of Indonesia’s new Mandalika International motorsport track were a series of Bomag pavers and rollers. They can claim a best-in-class finish when it comes to creating the ultimate surface for a competitive racing track.
  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km