Skip to main content

Fast resurfacing work

A Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early.
February 22, 2012 Read time: 1 min
A 2395 Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early. Championship motorcycle races began at the Midlands' premier race venue last month after resurfacing of the 2.25km track that organisers say will see lap times tumble for the 2011 season. Some 3,000tonnes of surfacing material was laid, overall. The results are said to be good and racers who have tried the track say that the surface is smoother than the old and has a lot more grip.

The W210 is an innovative machine powered by twin engines and features a 2.2m wide milling drum. The machine can be tailored to suit conditions and has three selectable milling drum speeds, suiting large-scale surface course rehabilitation, complete pavement removal at full depth or fine milling. Other features include automatic parallel alignment, intelligent track drive control to maximise traction, and Wirtgen's proprietary Widrive machine management and Level Pro levelling systems.

For more information on companies in this article

Related Content

  • Cold milling popular for road materials recycling
    July 4, 2012
    Milling techniques remain one of the most widely used recycling methods Well-proven, cold milling techniques remain one of the most widely used methods for materials recycling in road construction. Milled road materials can be cleaned up and re-used in both asphalt and concrete highway construction. German firm Wirtgen has long dominated the market for road milling machines and has the largest share of the sector (as well as the broadest product range), although other firms based in Europe and the US are be
  • Protecting new asphalt overlay
    October 20, 2017
    Techniques can help in preventing cracks in underlying layers from penetrating to new surface layers - *Farzad Tooryani. For road repairs involving milling off worn asphalt surface layers before repaving, the use of crack sealing is a crucial task. This can help to prevent full reflection of existing cracks from underneath layers into the new wearing course. Once the milling work is complete, locating existing cracks is a crucial task for the site supervisor. Efficient routing equipment that is easy to hand
  • Wirtgen scores a first in road recycling
    July 17, 2012
    Ireland is now using road recycling techniques in County Cork, with a Wirtgen WR2400 playing an important role. The 3.5km trial is pointing the way for future road rehabilitation projects in the country and is being carried out on a stretch of the busy N71, which links Cork with the peninsula in the south west of Ireland. This three-lane carriageway provides an important link as it is popular with tourists and the trial is being carried out between the towns of Inishannon and Bandon. The 3.5km trial has bee
  • Severn Bridge resurfacing complete
    April 30, 2019
    Contractor Hanson has completed the latest phase of its resurfacing work on the Severn bridges following the removal of the toll booths and barriers. The contract for Highways England started in December 2018, when the tolls were abolished on the M4 Prince of Wales Bridge and M48 Severn Bridge, and resurfacing was needed for the new road layout. The move to provide free access for drivers from England into Wales is aimed at boosting the Welsh economy. Over the last few weeks Hanson has laid more than