Skip to main content

Fast resurfacing work

A Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early.
February 22, 2012 Read time: 1 min
A 2395 Wirtgen W210 milling machine has played an important role in improving a race track in the UK. Specialist contractor Jordan Road Surfacing used the machine to help finish a major refurbishment at Mallory Park race circuit on budget and a week early. Championship motorcycle races began at the Midlands' premier race venue last month after resurfacing of the 2.25km track that organisers say will see lap times tumble for the 2011 season. Some 3,000tonnes of surfacing material was laid, overall. The results are said to be good and racers who have tried the track say that the surface is smoother than the old and has a lot more grip.

The W210 is an innovative machine powered by twin engines and features a 2.2m wide milling drum. The machine can be tailored to suit conditions and has three selectable milling drum speeds, suiting large-scale surface course rehabilitation, complete pavement removal at full depth or fine milling. Other features include automatic parallel alignment, intelligent track drive control to maximise traction, and Wirtgen's proprietary Widrive machine management and Level Pro levelling systems.

For more information on companies in this article

Related Content

  • Foaming option
    July 16, 2012
    Foamed bitumen is a versatile and cost-effective tool in recycling roads - Mike Woof reports Wirtgen hopes to capitalise on the growing demand for materials recycling and its range of solutions for this sector has expanded considerably in recent times. The firm has been taking advantage of further developments in foamed bitumen technology to offer an array of cost-effective road repair solutions. The range allows this material to be used in array of cold recycling applications and Wirtgen also offers labora
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac
  • Vögele | Sustainable road rehabilitation on the Dutch coast
    January 23, 2024
    In-place cold recycling with Wirtgen Group machines
  • Repaving an F1 racing circuit
    January 20, 2025
    The refurbishment of the Shanghai International Formula 1 was completed recently with great success. As an important milestone in the construction of racing facilities and modern high-grade roads in China, the project has attracted attention both inside and outside the industry.