Skip to main content

Eurovia Surfacing gives Windsor the royal treatment

Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate. Resurfacing was carried out as part of the annual programme of work that Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.
May 15, 2017 Read time: 2 mins
Road surfacing fit for a queen
Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate.


Resurfacing was carried out as part of the annual programme of work that 3281 Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.

Eurovia Surfacing secured the contract in 2013, re-won it in 2014 and successfully renegotiated the retention of the contract for 2015 and 2016.

Works include planing the road surface and replacing it with 45mm of a 14mm thin surface course system over 1800m². This had to be delivered in two halves, starting at the lower end on the first day and completing the top half up to the castle entrance on the second day.

Windsor is very popular with tourists and Christmas shoppers during December which made the works slightly more challenging for the teams involved but all went successfully.

For more information on companies in this article

Related Content

  • Successful resurfacing at New York's JFK Airport
    May 3, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • Hot-to-hot paving upgrades Bremen City Airport runway
    September 30, 2013
    A new high quality runway surface has been laid at Bremen City Airport. This has provided a much-needed replacement at the airport as the old runway was laid over 20 years ago and was suffering from cracking and potholes. Laying the new surface required the airport to be closed, with the work having to be carried out in a tight time schedule. Contractor Heitkamp Erd- und Straßenbau was brought in to carry out the work as the firm had experience in runway rehabilitation projects having carried out pavemen
  • Official sale of M6 Toll to be launched in September
    August 23, 2016
    An information memorandum that will officially launch the sale of M6 Toll, the UK’s only toll road, will be sent out to interested buyers in September. No date is set for sending out the IM, according to sources, but the 43km six-lane asset around the English city of Birmingham could be going for slightly less after the UK’s European Union referendum vote in June. The result of the so-called Brexit – ‘British exit’ of the EU – referendum was won by the no-to-Europe side and the UK is now setting up t
  • Runway resurfacing in Sardinia with Wirtgen machines
    December 7, 2017
    The fleet used comprised two Wirtgen W 210s and one W 200i, as well as two Wirtgen WR 2000 soil stabilisers. Located roughly 8 km north-west of the city of Alghero, Alghero-Fertilia Airport is one of three commercial airports on the Italian island, along with Cagliari Elmas and Olbia. Built as a military airport in the late 1930s, Alghero-Fertilia still occasionally handles military aircraft. However commercial flights represent its main traffic and as it serves the provinces of Sassari and Oristano, it is