Skip to main content

Eurovia Surfacing gives Windsor the royal treatment

Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate. Resurfacing was carried out as part of the annual programme of work that Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.
May 15, 2017 Read time: 2 mins
Road surfacing fit for a queen
Eurovia Surfacing recently completed resurfacing works on the prestigious Thames Street in the English city of Windsor – home to the UK royal family’s Windsor Castle. Thames Street runs up the side of the castle to the main gate.


Resurfacing was carried out as part of the annual programme of work that 3281 Eurovia Surfacing undertakes on behalf of the Royal Borough of Windsor and Maidenhead.

Eurovia Surfacing secured the contract in 2013, re-won it in 2014 and successfully renegotiated the retention of the contract for 2015 and 2016.

Works include planing the road surface and replacing it with 45mm of a 14mm thin surface course system over 1800m². This had to be delivered in two halves, starting at the lower end on the first day and completing the top half up to the castle entrance on the second day.

Windsor is very popular with tourists and Christmas shoppers during December which made the works slightly more challenging for the teams involved but all went successfully.

For more information on companies in this article

Related Content

  • Lanes removes 400tonnes of debris from flood-scheme tunnel in UK
    March 28, 2017
    It was “dirty work” for drainage engineers from Lanes Group in the UK when they recently removed 400tonnes of silt and debris from a culvert in northern England. Before sludge removal started, the 3m-wide concrete box culvert under the A38 on the outskirts of the city of Derby had been full almost to its roof. Lanes Group's East Midlands depot, based in Derby, desilted the culvert in a 17-day operation for North Midland Construction, working for Highways England, under its civil engineering framework.
  • From Bangalore to Dumfries, plastic waste technology is reinforcing our roads
    May 2, 2018
    At last some good news about plastic waste: road authorities around the world are starting to use it in their roads - Kristina Smith reports.
  • Vinci picks up Lafonataine Tunnel work
    August 12, 2020
    The renovated tunnel is expected to have about 40 years of life.
  • Cost-effective innovative backfill recycling
    February 29, 2012
    Day Aggregates offers a novel materials recycling approach - Kristina Smith reports Here's a neat idea: take the muck from utilities trenches, treat it and reuse it, saving between 30-40% on the cost of landfill and backfill. This, in essence, is the theory behind Day Aggregates' EcoFILL 40 material. Confident of a growing market for this type of product, Day has invested over €569,000 (£500,000) in a new plant at its 3.4ha site in south London. "There is great demand for a solution to waste streams which