Skip to main content

Horiba Mira to deliver autonomous parking project in UK

Horiba Mira has partnered with Coventry University to deliver the Trusted and Autonomous Parking (Park-IT) project at a facility under construction in the UK. Park-IT is one of eight projects that create Testbed UK, an ecosystem led by the Centre for Connected and Autonomous Vehicles and Zenzic which seeks to accelerate the development of autonomous technology. Chris Reeves, head of C/AV technologies at Horiba - an automotive engineering and development consultancy - says Park-IT brings a testing fac
August 9, 2019 Read time: 2 mins
Horiba 3158 Mira has partnered with Coventry University to deliver the Trusted and Autonomous Parking (Park-IT) project at a facility under construction in the UK.

Park-IT is one of eight projects that create Testbed UK, an ecosystem led by the Centre for Connected and Autonomous Vehicles and Zenzic which seeks to accelerate the development of autonomous technology.

Chris Reeves, head of C/AV technologies at Horiba - an automotive engineering and development consultancy - says Park-IT brings a testing facility to the UK that will “help to ensure the next generation of connected and autonomous vehicles are safe and secure”.

“Autonomous valet parking will be one of the first wide-scale adopted examples of highly automated driving, and the creation of Park-IT will allow for the validation of this technology in a safe and repeatable way,” he adds.

The partners will develop a multi-storey car park, on-road parking bays and parking lot environments for the facility’s proving ground in the Midlands.

The parking areas will be co-located in Horiba Mira City Circuit, a purpose-built ‘cityscape’ test track environment. The facility will be supported by a ‘digital twin’, allowing users to replicate parking scenarios in simulation.

For more information on companies in this article

Related Content

  • Self-healing roads, slippery roads and slimmer roads
    November 24, 2017
    This month’s bitumen technology pages bring you self-healing roads, slippery roads and slimmer roads and explains why one UK contractor has started manufacturing its own polymer modified bitumen - Kristina Smith reports. Professor Erik Schlangen, who heads up experimental micromechanics at the Delft University of Technology is receiving calls from all round the world these days. And it is hardly surprising because he and his team have invented a great new technology: asphalt that heals itself.
  • Busy UK interchange on M1 motorway close to completion
    August 28, 2018
    Work on a busy interchange on the UK motorway network is close to completion. The new off-slip has opened at junction 24 of the M1 motorway. The work to upgrade junction 24 and junction 24a is being carried out by contractor Winvic Construction. The new off-slip at junction 24 provides a direct connection from the A50 eastbound to the M1 southbound. The work forms part of SEGRO’s Nationally Significant Infrastructure Project (NSIP) - SEGRO Logistics Park East Midlands Gateway (EMG) - a ground-breaking
  • VIDEO: Telstra drone LIDAR maps Melbourne’s EastLink Mullum Tunnel
    April 13, 2018
    One of the applications for LIDAR is to make high resolution 3-D maps. Self-driving cars are pre-loaded with a LIDAR map of the trials area in which they are permitted to fully self-drive themselves. The cars also have their own LIDAR scanner which captures a real-time LIDAR view of the vehicle’s surroundings. The fully autonomous driving system within these prototype cars compares the real-time LIDAR view against the pre-loaded LIDAR map to significantly increase the accuracy of their self-positioning
  • Stantec: coming to an infrastructure site near you
    April 13, 2017
    Acquisitive Canadian firm Stantec is snapping up more transportation expertise as it moves out of its home North American market. David Arminas reports. Last December, politicians from the US states of Kentucky and Indiana celebrated the opening of the second of two major bridges. A ribbon-cutting ceremony took place in cold wintry weather on the new 762m-long cable-stayed Lewis and Clark Bridge. The event marked the finish of the prestigious three-and-half-year Ohio River Bridges Project.