Skip to main content

Sri Lanka Airport runway upgrade

Sri Lanka’s main international airport now features a new runway surface that will help improve air transport efficiency at the facility The project was carried out successfully, despite a tough time schedule, boosting safety at the airport. This new runway will help increase capacity at the airport, allowing Sri Lanka to develop the tourist sector on which the country depends heavily for its economic growth. The work at the international airport for Sri Lanka’s capital Colombo was carried out with the
December 7, 2017 Read time: 2 mins
Eight Dynapac twin drum rollers worked behind the pavers to bring the mat to the necessary compaction specification

Sri Lanka’s main international airport now features a new runway surface that will help improve air transport efficiency at the facility

The project was carried out successfully, despite a tough time schedule, boosting safety at the airport. This new runway will help increase capacity at the airport, allowing Sri Lanka to develop the tourist sector on which the country depends heavily for its economic growth.

The work at the international airport for Sri Lanka’s capital Colombo was carried out with the help of compaction and paving equipment from 206 Dynapac. The reconstruction of the runway at Colombo Bandaranaike International Airport was completed successfully ahead of schedule and has helped to improve the aviation facilities in Sri Lanka greatly, according to the client.

Because this reconstruction project was prioritised as an important transportation hub for the China Belt & Road Initiative, it was carried out by the Chinese contractor, China National Aero-Technology International Engineering Crop (AVIC-ENG). This contractor specialises in carrying out work outside of China, including construction activities. The firm utilised eight Dynapac twin drum compactors rollers; five of the CC522 models and three of the CC624 units. These asphalt compactors operated behind the four Dynapac pavers; two SD2530CS and two SD2550 models. These machines were able to lay the asphalt and compact it to the tight specification required by the client, ahead of the original time schedule.

Work started on the project at the beginning of 2017 and the job was initially expected to be complete by April 6th 2017. However, the main runway construction was finished before the end of March 2017 due to the efficiency of the contractor’s operations and also the dependability of the equipment and the support provided. Working day and night, the paving crew was able to operate at high speed while delivering a precise finish.

For more information on companies in this article

Related Content

  • Recycling used for German road expansion project
    April 20, 2018
    A milling machine from Bomag has been carrying out an important portion of the work needed for a four-lane expansion of a busy route in Southern Germany Widening work has been carried out on the B85 route from Amberg to Pittersberg in Bavaria to boost its capacity. The 2.6km section was prioritised as being in urgent need of improvement by the Federal transport Ministry. Construction work commenced in mid-2017, starting with preparation works and the project includes a cloverleaf interchange to connect t
  • LiuGong’s Zeng Guang’an Spoke on the Development of the Manufacturing Industry at China’s National People’s Congress
    May 14, 2018
    The first session of the 13th National People's Congress (NPC) opened in the Great Hall of the People in Beijing recently. Chinese premier Li Keqiang delivered the annual report on the work of the government at the opening ceremony. Zeng Guang’an, NPC deputy for Guangxi Zhuang Autonomous Region and chairman of Guangxi Liugong Group, attended the conference. Zeng Guang’an listened to the Government Report and participated in the panel discussion of Guangxi Zhuang Autonomous Region. He reported to premier Li
  • New link for Shigatse Airport in China
    September 13, 2018
    A new 167km highway will be built in the Tibet Autonomous Region of China. This will provide an improved transport link between Shigatse (Xigaze) Peace Airport and Lhasa. The project is expected to cost US$3.95 billion. A feasibility study has been carried out into the project and submitted to the region’s transport department. The existing G318 National Road connects the airport with Lhasa but features a number of sharp turns and the new link will provide extra capacity as well as improved safety levels
  • Rolling out new and improved concrete pavers
    February 10, 2012
    Paver innovations The manufacturers are also rolling out several new and improved concrete paving models, with versatility and adaptability high on the agenda. GOMACO is now offering a novel independent IDBI attachment that allows dowel bar insertion behind a paver to form the transverse joint. The IDBI attachment is a new generation bar insertion system.