Skip to main content

New tests aim for longer pavement life and reduced surface problems

Highways authorities around the world are testing every component of a pavement in a bid to improve durability. Kristina Smith looks at two very different examples, one from the UK and one from the US
October 24, 2019 Read time: 2 mins
AETEC’s wear simulator put 36 road marking products through their paces in a project which aims to prevent ‘ghost markings’

English national roads authority 8100 Highways England has moved onto the second stage of a £685,000 research project which aims to find hard-wearing road markings and materials that can remove those markings.

The authority believes that the findings of its research could help improve road safety and decrease whole-life pavement costs around the world.

Paid for out of a £1.5 million innovation fund, the project is part of a four-year research program which aims to drive improvements across England’s motorway and A-road network. Application and removal of road markings was identified as one of the most important areas for research.

Often, the shape of old markings can still be seen on a road even after they have been removed. These ‘ghost markings’ can be confusing for drivers and cause problems for autonomous and semi-autonomous vehicles. Water-blasting or shot-blasting removal techniques for markings cause damage to the surface of the road, leading to cracks and potholes which reduce the lifetime of the pavement.

Ghost markings.JPG
Remaining on roads, 'ghost markings' can confuse drivers and autonomous vehicles

The first phase of the Highways England research saw 36 road marking products from around the world tested at Spain’s AETEC facility in Madrid. “The Spanish facility, as well as being highly respected in the industry and in this field, was able to recreate our road surface,” said Martin Bolt, corporate group leader at Highways England who has been overseeing the research. “Elsewhere the tyres would have been tested on a smooth surface.”

The road marking products, which included thermoplastic, water-based paint, cold plastic and tapes, were tested for skid resistance, dry retroreflectivity, wet retroreflectivity and contrast. A series of images were taken during each testing cycle, including microscopic views.

After 12 months, the products will be removed using five different products. Contractor Kier and specialist road marking supplier Roadcare are working on the research project with Highways England.

For more information on companies in this article

Related Content

  • VF Venieri: the perfect marriage of quality & competitive TCO
    July 6, 2023
    Established in Lugo in 1948, VF Venieri (Venieri) has always kept its HQ and production facility in Emilia-Romagna’s Motor Valley. The company’s mission is to supply earthmoving machinery renowned for its high performance, productivity and flexibility, coupled with very competitive TCO (total cost of ownership).
  • Light but strong, the Tetrashor prop
    June 30, 2020
    RMD Kwikform, the global manufacturer of formwork, falsework and ground shoring solutions, has launched Tetrashor, a lightweight modular propping system. It can be used in dead shoring, façade retention, propping and needling, supporting precast concrete bridge beams and structural steelwork frames and restraining tall single and double-sided formwork.
  • New bridges, ramp and tunnel for Dubai
    February 19, 2020
    New flyover bridges, a ramp and a tunnel connection are being built in Dubai.
  • Innovations in power systems for industry
    September 19, 2019
    Major innovations in power systems and drivelines are offering increased efficiency and reduced emissions for the future of construction machines - Mike Woof writes