Skip to main content

Light but strong, the Tetrashor prop

RMD Kwikform, the global manufacturer of formwork, falsework and ground shoring solutions, has launched Tetrashor, a lightweight modular propping system. It can be used in dead shoring, façade retention, propping and needling, supporting precast concrete bridge beams and structural steelwork frames and restraining tall single and double-sided formwork.
June 30, 2020 Read time: 2 mins
Tetrashor can be used in dead shoring, façade retention, propping and needling and supporting precast concrete bridge beams

The system’s 400kN loading capacity means a minimum number of props are required, helping to reduce costs and assembly time. At the same time, says RMD, it has been designed with lightweight components, so the product can be easily carried by workers, with no need for a crane.

With a weight of only 30kg/m, Tetrashor delivers an excellent strength-to-weight ratio, according to the company.

Tetrashor’s versatility is a key feature. It can be used horizontally, vertically or inclined. The Tetrashor prop can also be used as a group of four to create a Tetrashor tower, providing a loading capacity of up to 1600kN for heavy, concentrated loads.

Tetrashor is compatible with RMD Kwikform’s range of falsework systems, including Megashor, Rapidshor and Superslim and is available in five prop variants to suit most applications.

Tetrashor can be used horizontally, vertically or inclined
Tetrashor can be used horizontally, vertically or inclined

The system also features an innovative KwikStrike load release mechanism for workers to release loads in a quick and controlled manner. With other systems, removing loads can be a long and exhausting process but testing has proven that activating KwikStrike requires only two or three hits from a hammer. RMD says that this not only reduces labour and time, but it minimises noise, safety risks and damage to equipment.

A range of hydraulic jacking options are available, enabling the controlled application, monitoring and release of loads should the application demand precision, explained Ian Fryer, divisional product innovation director at RMD Kwikform. “When superior prop strength is a key requirement, the compromise is generally a heavier system that is more difficult to manoeuvre. Conversely, lightweight but less strong systems often require more materials to meet loading capacities, adding to erection times and costs,” he said.

“With Tetrashor, contractors do not have to compromise. Tetrashor provides a safe, cost-effective and efficient solution, helping to overcome common industry challenges by supporting heavy loads, while also improving productivity through its versatility and design. For instance, less bracing is required on longer props than alternative solutions, helping contractors to keep costs down,” said Fryer..

For more information on companies in this article

Related Content

  • RMD launches R800 panel girder
    July 19, 2022
    RMD Kwikform has launched its heavy-duty R800 modular panel girder system which the company says is the only CE-marked girder system on the market.
  • New and User-friendly PERI UP Scaffolding Components Combine Efficiency and Safety
    June 1, 2021
    The tried and tested components of the PERI UP Scaffolding Kit are now available in optimised form
  • Innovative formwork solution to bridge construction
    February 20, 2012
    Innovative solutions are being applied to the construction of bridge structures as Patrick Smith reports. RMD Kwikform Iberica has engineered and supplied specialist formwork and falsework for construction of the much-needed Monteporreiro Viaduct in northern Spain. The viaduct will connect Monteporreiro with the Benedictine Monastery of San Bieito Lérez on the other side of the river, and in the process will ease congestion in the nearby town of Pontevedra, diverting some 5,000 vehicles/day.
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours