Skip to main content

Terex excavators for Belgian company

Belgian Terex distributor, Terex Kemp, is supplying 18 excavators to Groep Verbraeken Construction in a deal that the company says should help instil confidence in the Belgian construction industry. Terex Kemp, the main Terex distributor for Belgium since 2003, is delivering ten TC35 and five TC48 compact crawler excavators, alongside three TW85 compact wheeled excavators. The company's sale of Terex excavators follows two prior successful months, which saw them sell more than 55 machines in July and August
March 2, 2012 Read time: 2 mins
The Terex TC35 at work in Belgium
Belgian 1222 Terex distributor, Terex Kemp, is supplying 18 excavators to Groep 3567 Verbraeken Construction in a deal that the company says should help instil confidence in the Belgian construction industry.

Terex Kemp, the main Terex distributor for Belgium since 2003, is delivering ten TC35 and five TC48 compact crawler excavators, alongside three TW85 compact wheeled excavators. The company's sale of Terex excavators follows two prior successful months, which saw them sell more than 55 machines in July and August.

Tom Vendelmans, director of Groep Verbraeken Construction, says: "These days, competitive pricing is very important to us, but we were also impressed by the approach of Kemp and its employees. We have 130 pieces of equipment, so spare parts and responsive service are also top of our list of requirements. In this respect, Kemp is the perfect partner for us."

Ben Kemp, owner and director of the Kemp group says: "We have invested significantly in our company and believe in Terex as a leading brand."

For more information on companies in this article

Related Content

  • Forming iconic structures
    July 18, 2012
    Specially designed and constructed formwork is being used to create some iconic bridges worldwide The Golden Ears Bridge over the Fraser River will unite the municipalities of Richmond, New Westminister and Delta in the scenic British Columbia province of Canada. The bridge, part of a CAD$800 million (US$670 million) project, is an 'extra dosed' cable stayed bridge, which means the deck will be supported by both cables and the structure itself. This design reduces the overall height of the two towers as req
  • Working in tandem
    August 16, 2018
    A tandem crane lift has been carried out in Kuwait on a major project in using Demag machines from Terex. The two machines have been used on the Kuwaiti government's Sheikh Jaber Al Ahmad Al Sabah Causeway Project. This 36km-long road connection is among the world's largest infrastructure projects underway at present. The project includes a 27km-long bridge over Kuwait Bay. The Kuwaiti logistics service provider Integrated Logistics Company (ILC) is carrying out key sections of the project, moving pre-a
  • Wacker Neuson builds on Caterpillar link
    November 14, 2012
    Bolstered by building machines for Caterpillar and high demand for its VDS equipped excavators, Wacker Neuson has greatly increased its compact equipment building capability in Linz - Nick Johnson reports At a time when some other construction equipment makers have still scaled back their operations following the global economic crisis, Wacker Neuson has been busy building new facilities and increasing its production capacity. Last month the company officially opened its new compact equipment production fac
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on