Skip to main content

Construction equipment investment in Brazil

The new CNH Industrial Complex in Brazil, which comprises a Case factory and a modern CNH parts logistics and distribution centre, has opened in the city of Sorocaba, São Paulo state. The opening of the complex will generate 3,000 direct jobs (up to 6,000 including indirect jobs) in the region according to a forecast of up to two years, when the factory reaches it full production capacity.
February 17, 2012 Read time: 2 mins
CNH employees celebrate the opening of the new complex
The new 1595 CNH Industrial Complex in Brazil, which comprises a 176 Case factory and a modern CNH parts logistics and distribution centre, has opened in the city of Sorocaba, São Paulo state.

The opening of the complex will generate 3,000 direct jobs (up to 6,000 including indirect jobs) in the region according to a forecast of up to two years, when the factory reaches it full production capacity.

The project results from an investment of R$1 billion (e418 million), part of an investment plan by the 1243 Fiat Group for the 2007-2011 period announced in November 2006 by Sergio Marchione, Fiat Group CEO.

With this factory, the Fiat Group significantly increases its operation in the state of São Paulo with the highest machine industry investment in one instance ever made in the history of the country.

The objective of the company is to increase agricultural and construction machine production, which today takes place at the Curitiba, Piracicaba and e Contagem units, and manufacture components for other machines produced by the other company units in Brazil. The Sorocaba factory will produce equipment to supply the domestic market and it will also be exported to other Latin American countries and more than 50 countries around the world.

"Sorocaba is going to produce agricultural and construction machines that are part of the world platform of the two brands. It will allow us to increase our production to better serve the agricultural and construction markets," says Valentino Rizzioli, president of CNH for Latin America and executive vice-president of the Fiat Group.

For more information on companies in this article

Related Content

  • XCMG boosting capacity
    November 26, 2012
    Increased manufacturing capacity has been a key focus for XCMG in recent years, with the firm having committed to upgrading its production facilities. XCMG has invested heavily in new manufacturing capacity for its ranges of cranes and wheeled loaders and both the Heavy Machinery and Wheeled Loader divisions now have new factories. The heavy crane facility produces machines in the 90tonne category and above and all production moved to the new plant in 2012 as the old factory was too small. The new facility
  • LiuGong 900E excavators “very key” for company future
    January 6, 2017
    A senior LiuGong figure says the company’s keenly awaited 900E Series excavator is a “very key machine” for its future. Dave Beatenbough, vice president of the Chinese construction equipment manufacturing giant’s research and development arm, said production of the model at LiuGong’s Dressta base in Poland was expected to begin “within three months”.
  • LiuGong 900E excavators “very key” for company future
    April 16, 2013
    A senior LiuGong figure says the company’s keenly awaited 900E Series excavator is a “very key machine” for its future. Dave Beatenbough, vice president of the Chinese construction equipment manufacturing giant’s research and development arm, said production of the model at LiuGong’s Dressta base in Poland was expected to begin “within three months”.
  • Flexible under-bridge inspection unit
    March 21, 2012
    Barin has exported its ABC 60/L skid unit machine to Brazil for use in bridge inspections in the South American country. The machine, which has an under bridge working length of 6m, has been mounted on a two-axle Iveco Daily 70C16 truck chassis by a Barin technician based in Brazil. Supplied to Rentavale Equipamentos LTDA, based in Sao Paulo, the ABC 60/L is made of aluminium alloy and has fixed and sliding elements, the latter extending up to 6,000mm horizontally whilst under bridge. Its platform width is