Skip to main content

Sennebogen’s Algiers bridge

The Algerian SAPTA construction company, who specialise in road and traffic infrastructure construction, is using a Sennebogen 2200 crawler crane to assist with their commission to build a bridge in Algiers. Sennebogen service and sales partner EURL SM Maintenance delivered the 2200 crawler crane to SAPTA in July this year. It has since been set to work lifting, piece by piece, the steel support for the 600m long Algiers-based bridge. The crane will also be used for a range of other lifting tasks required a
January 21, 2013 Read time: 2 mins

The Algerian SAPTA construction company, who specialise in road and traffic infrastructure construction, is using a Sennebogen 2200 crawler crane to assist with their commission to build a bridge in Algiers.

2924 Sennebogen service and sales partner EURL SM Maintenance delivered the 2200 crawler crane to SAPTA in July this year. It has since been set to work lifting, piece by piece, the steel support for the 600m long Algiers-based bridge.

The crane will also be used for a range of other lifting tasks required at the construction site. Thanks to what Sennebogen describe as the 2200 model’s winching power of 170kN and quick rope speeds, even the most heavy of steel supports can be placed in precisely the right position in no time at all.

Once SAPTA has completed construction, the huge construction site will be an approach road to a new industrial area. SAPTA say the project is challenging, particularly in light of the tight schedule and stringent quality expectations.
Managers at the company are said by Sennebogen to favour one of its machine’s due to their excellent quality and reliable service provided by local sales partner, EURL SM Maintenance.

In particular, the operators have praised the day-to-day work benefits of the 2200’s spacious and comfortable maXcab cab. Sennebogen say the cab not only offers ergonomic comfort, but also a superb view and optimum safety features.

Due to its telescopic crawler unit, the 2200 is quick moving yet stable and secure when on terrain. SAPTA is extremely pleased with the performance of the machine and is full of praise for its excellent handling. Sennebogen says its 2200 machine is set to continue to play a vital role at future SAPTA construction sites.

For more information on companies in this article

Related Content

  • Almost gone: Canada’s old Port Mann Bridge deconstructed
    August 14, 2015
    Three years ago a welder’s cut halved Canada’s old Port Mann Bridge. David Arminas reports from the banks of the Fraser River. By the time this issue of World Highways reaches you, one of Canada’s iconic steel arch bridges will be a shadow of its former self. It’s been a three-year demolition job since the first cut across the deck of the old Port Mann Bridge just outside the city of Vancouver on Canada’s Pacific coast. A new 10-lane 2.2km Port Mann Bridge opened in 2012 (see box). It runs parallel to the o
  • Sennebogen gives Danube bridge restoration a lift
    April 2, 2014
    Built in the 12th century, the Stone Bridge spans the River Danube as the most significant emblem of the city of Regensburg, in southern Germany. In the course of the protracted restoration work, Strabag is using a new Sennebogen 608 Multicrane for various lifting and construction tasks. Although the historic structure of the city was built within only 11 years, between 1135 and 1146, the restoration tasks for the Stone Bridge at Regensburg have been underway for three years and are not expected to be co
  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Atlas Copco attachments make short work of the A8 Blaubeurer Weg Bridge
    March 21, 2016
    A reinforced concrete bridge over the Autobahn 8 between Merklingen and Nellingen in southern Germany was demolished overnight due in no small part to the efficient, reliable performance of Atlas Copco hydraulic attachments. In addition to demolition grippers, breakers and pulverisers, the demolition team used the HM 2000 hydraulic magnet to demolish structures and sort demolition waste. There is now nothing to stop the widening of the A8 to six lanes or construction of the parallel high-speed Wendlingen