Skip to main content

Lanes Group praised for helping fast-track UK jam-busting road

The UK drainage and maintenance specialist Lanes Group has helped deliver the new A453 dual-carriageway in the county of Nottinghamshire, one of England’s worst congestion areas. Main contractor Laing O'Rourke managed the two-and-a-half-year project that included the widened commuter route from Junction 24 of the M1 motorway to the A52 highway in Nottingham city centre at a cost of US$265 million. The new road - named Remembrance Way in honour of the 453 British soldiers who lost their lives in Afgha
October 16, 2015 Read time: 2 mins
The UK drainage and maintenance specialist 7891 Lanes Group has helped deliver the new A453 dual-carriageway in the county of Nottinghamshire, one of England’s worst congestion areas.

Main contractor Laing O'Rourke managed the two-and-a-half-year project that included the widened commuter route from Junction 24 of the M1 motorway to the A52 highway in Nottingham city centre at a cost of US$265 million.

The new road - named Remembrance Way in honour of the 453 British soldiers who lost their lives in Afghanistan - opened in July.

Services provides by Lanes Group's depot in the city of Derby, included CCTV drainage surveys, drainage jetting, specialist cutting services, patch lining and pipe-deformity repair.

In one case, a CCTV survey found deformation of a 300mm diameter surface water pipe, 25m from the manhole access point and beneath a newly-laid roadway.

Laing O'Rourke considered the option of excavating the new roadway to replace the faulty pipe. However, Lanes was able to cut out the deformed inner wall of the plastic pipe and reline the section.

“We provided just about every service in our repertoire to support this scheme,” said Chris Norbury, area development manager for Lanes Derby. "We're delighted that, at key moments, our specialist expertise has made the difference in terms of resolving important drainage issues."

"On a number of occasions their specialist expertise has provided solutions that have saved us time and money,” said Laing O'Rourke civil engineer Joseph Maltezos.

A sub-contractor had mistakenly driven a spike through a drainage line. Lanes used a specialist cutter to remove it and patch line in the hole - avoiding a costly excavation.

For more information on companies in this article

Related Content

  • Economic gains from widening the A453 in Nottingham, England
    August 12, 2014
    Work is well underway on turning a busy just over 11km two-lane link road from the city of Nottingham to Junction 24 of the M1 in Leicestershire, England into a four-lane highway. The widened highway will relieve considerable peak-time congestion for travellers to Nottingham, the M1 and East Midlands Airport while also making journeys safer and more reliable. Guy Woodford reports Used by up to 30,000 vehicles a day, the A453 is renowned for congestion at peak travel times. But years of day-to-day commuter a
  • UV lining is highway drainage first for UK motorway upgrade
    December 19, 2017
    Drainage specialist Lanes Group is implementing the first project to extensively line highway drainage pipes as part of a Smart Motorway initiative in the UK. Lanes has been commissioned by the Carillion Kier Joint Venture working for Highways England to install ultra-violet – UV - liners during the M6 Junction 16-19 Smart Motorway scheme between Crewe and Knutsford, in county Cheshire. Lanes said that it is the first time that roadside drainage pipes will have been extensively lined, instead of being
  • Innovative new drainage solutions will help keep roads free from water
    October 2, 2014
    An array of new technologies will help optimise road drainage and minimise flooding risks - Mike Woof reports In the UK the specialist contractor Lanes Group has carried out extensive inspection work of the drainage systems for the M6 toll route around the city of Birmingham. A powerful zoom camera has been used to carry out the inspection work for Midland Expressway, which operates and maintains the 43km-long motorway, running from Coleshill to Cannock.
  • Work underway on major UK road widening scheme
    January 14, 2013
    Work on a major US$241.9 million (£150m) road widening scheme in the East Midlands region of England has started near Nottingham. The works will focus on an 11.26km (seven mile) stretch of the A453 between M1 Junction 24 and the A52 Nottingham Ring Road – a major link serving Nottingham, the M1 and East Midlands Airport.