Skip to main content

Lanes Group praised for helping fast-track UK jam-busting road

The UK drainage and maintenance specialist Lanes Group has helped deliver the new A453 dual-carriageway in the county of Nottinghamshire, one of England’s worst congestion areas. Main contractor Laing O'Rourke managed the two-and-a-half-year project that included the widened commuter route from Junction 24 of the M1 motorway to the A52 highway in Nottingham city centre at a cost of US$265 million. The new road - named Remembrance Way in honour of the 453 British soldiers who lost their lives in Afgha
October 16, 2015 Read time: 2 mins
The UK drainage and maintenance specialist 7891 Lanes Group has helped deliver the new A453 dual-carriageway in the county of Nottinghamshire, one of England’s worst congestion areas.

Main contractor Laing O'Rourke managed the two-and-a-half-year project that included the widened commuter route from Junction 24 of the M1 motorway to the A52 highway in Nottingham city centre at a cost of US$265 million.

The new road - named Remembrance Way in honour of the 453 British soldiers who lost their lives in Afghanistan - opened in July.

Services provides by Lanes Group's depot in the city of Derby, included CCTV drainage surveys, drainage jetting, specialist cutting services, patch lining and pipe-deformity repair.

In one case, a CCTV survey found deformation of a 300mm diameter surface water pipe, 25m from the manhole access point and beneath a newly-laid roadway.

Laing O'Rourke considered the option of excavating the new roadway to replace the faulty pipe. However, Lanes was able to cut out the deformed inner wall of the plastic pipe and reline the section.

“We provided just about every service in our repertoire to support this scheme,” said Chris Norbury, area development manager for Lanes Derby. "We're delighted that, at key moments, our specialist expertise has made the difference in terms of resolving important drainage issues."

"On a number of occasions their specialist expertise has provided solutions that have saved us time and money,” said Laing O'Rourke civil engineer Joseph Maltezos.

A sub-contractor had mistakenly driven a spike through a drainage line. Lanes used a specialist cutter to remove it and patch line in the hole - avoiding a costly excavation.

For more information on companies in this article

Related Content

  • Lanes removes 400tonnes of debris from flood-scheme tunnel in UK
    March 28, 2017
    It was “dirty work” for drainage engineers from Lanes Group in the UK when they recently removed 400tonnes of silt and debris from a culvert in northern England. Before sludge removal started, the 3m-wide concrete box culvert under the A38 on the outskirts of the city of Derby had been full almost to its roof. Lanes Group's East Midlands depot, based in Derby, desilted the culvert in a 17-day operation for North Midland Construction, working for Highways England, under its civil engineering framework.
  • RAC blasts UK Government's poor infrastructure investment
    May 14, 2012
    The UK’s motorists are facing increased congestion and longer delays due to a steady increase in vehicle numbers combined with reduced spending on transport infrastructure. A report by the RAC Foundation warns that there will be 4,000,000 more cars on the UK’s roads in the next 25 years, while the UK’s Government has not explained what plans it has to cope with the projected increase in traffic. The report predicts a 43% rise in traffic volume by 2035, with the biggest increase in the East Midlands. The fou
  • Drainage for new Wear Crossing in UK
    January 21, 2016
    In the UK the Lanes Group is carrying out the contract to build specialist drainage for the New Wear Bridge in Sunderland. The Lanes Group will carry out this work for the joint venture partners building the new bridge link.
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.