Skip to main content

Opening St Petersburg's key tollway ring road

A new section of Western High Speed Diameter (WHSD) highway from the Ring Road (KAD) to the Hyundai plant in Kamenka, has been opened to traffic in St Petersburg. The WHSD and KAD interchange will be completed by 2012 when the entire third phase of the highway will be built. The US$7.23 billion WHSD Tollway in the city is sponsored by the Federal Road Agency and it is said to be one of the most important means of solving the city’s transport problems. It is a strategic investment project to develop the ci
May 15, 2012 Read time: 2 mins
A new section of 3639 Western High Speed Diameter (WHSD) highway from the Ring Road (KAD) to the 236 Hyundai plant in Kamenka, has been opened to traffic in St Petersburg.

The WHSD and KAD interchange will be completed by 2012 when the entire third phase of the highway will be built.

The US$7.23 billion WHSD Tollway in the city is sponsored by the 2612 Federal Road Agency and it is said to be one of the most important means of solving the city’s transport problems. It is a strategic investment project to develop the city as a major world transport hub.

Scheduled for completion in 2015, the WHSD will also allow, together with the Ring Road, closure of the first transport ring around St Petersburg.

About 55% of the 46.6km long, mostly eight-lane, urban motorway will be elevated with 15 interchanges at different levels, and bridge structures with 55m and 35m clearances over the ship fairway will be the first structures of their type in Russia.

Meanwhile, discussions have been held regarding a section of the Moscow-St Petersburg highway, which was to have been built through the Khimkinsky Forest, part of the Russian capital’s green belt.

A final decision over the route of the highway has yet to be made, although the project is expected to cost over E700 million in all to complete.

For more information on companies in this article

Related Content

  • New design for Sydney’s WestConnex motorway project third stage
    November 14, 2016
    Sydney’s proposed WestConnex motorway will be wider than planned to accommodate four instead of three lanes in each direction, according to media reports. The changes are part of a revamp of the third and final stage of the ambitious project in the capital city of Australia’s eastern New South Wales state. Some exit and entry ramps will also be scrapped but the overall cost of just under US$5.3 billion for the third stage remains unchanged, reported the Sydney Morning Herald newspaper. The projects
  • India’s new expressway link
    April 12, 2021
    Accelerated road construction methods are being used to build an expressway link in India, setting records along the way
  • Integrated corridor management offers transportation efficiency
    May 28, 2013
    In the Intelligent Transportation Systems world, the concept of managing roadway or transportation corridors is not new. Smart Corridor concepts have existed for some time, such as the Santa Monica Smart Corridor system from the 1990s. Across the world, a new emerging model for operating roadway transportation networks called integrated corridor management (ICM) has emerged. This is particularly true in California, where several new ICM projects have or are being deployed. There is a new paradigm for corrid
  • Dubai to host the 18th IRF World Meeting & Exhibition planned for 2021
    February 10, 2020
    Dubai, one of the world’s iconic cities, has been designated to host the International Road Federation’s World Meeting & Exhibition on November 8th-11th, 2021.