Skip to main content

Nepal's traffic improvements on track

Nepal's Department of Roads is now analysing traffic data based on research work into congestion carried out by consultants. Two local consulting firms were appointed to carry out a study of flyovers, underpasses and ramps in congested areas.
April 26, 2012 Read time: 1 min
2664 Nepal's Department of Roads is now analysing traffic data based on research work into congestion carried out by consultants. Two local consulting firms were appointed to carry out a study of flyovers, underpasses and ramps in congested areas. The work focussed on major intersections where traffic jams have affected the whole system. Kalimati, Tripureshwor, Thapathali, New Baneshwor and Old Baneshwor have been identified as the most congested areas where traffic congestion has to be improved. The studies are now complete and different options have been proposed for each intersection based upon the location. The Department of Roads is now consulting with the stakeholders along with the authorities. The Kathmandu Metropolitan City, 2437 Ministry of Physical Planning and Works, Transport Ministry, Traffic Police and the Transport Association are all involved in the consultation process. Construction of the improved intersections will be completed in 3-5 years with the aim of coping with traffic growth for the next 15 years. The Nepalese Government is also widening key roads in Kathmandu at present so as to address traffic congestion.

For more information on companies in this article

Related Content

  • GPS machine control speeds dangerous road improvement
    April 11, 2012
    A Canadian contractor has carried out major roadworks to improve safety on a dangerous stretch of road, using technology to complete the work smoothly. Wiltech Developments, located in West Kelowna, British Columbia, has a great deal of experience. In the contracting sector. The firm works in most. of British Columbia and currently owns more than 40 pieces of heavy machinery, with the majority of these units featuring Trimble Grade Control equipment, a move that has improved its operations.
  • Brisbane's highway of distinction
    August 2, 2012
    A massive AU$2 billion update of the Gateway Motorway in Queensland is underway to improve an infrastructure stretched by population boom. Report and photographs by Adrian Greeman Just 20 years after the Australian city of Brisbane built its Gateway Motorway with a high slim signature bridge dominating the river skyline, the road is being completely revamped. Some 12km of urban route on the south of the Brisbane River is being expanded to take much increased traffic levels; the north is getting a completely
  • MAD about Vitronic in Germany
    April 30, 2025
    Vitronic has supplied two of its latest sensor columns to the project MAD Urban (Managed Automated Driving for Urban Mobility and Logistics) being set up in Braunschweig (Brunswick).
  • Traffic congestion plan for Algerian capital
    December 17, 2012
    Plans are being worked on that will attempt to reduce traffic congestion in Algerian capital Algiers. The city has a chronic traffic problem, with some 1.7 million registered vehicles circulating on a road network with insufficient capacity. Blocked routes and bottlenecks compound the problem in many areas so a new plan aims to address these issues by building new major and minor roads, underpasses and flyovers. Also included are multi-storey car parks, park and ride schemes and coach stations. The new plan