Skip to main content

Communications systems key to tunnel safety

Paul Ducker Systems (PDS), a sub-contractor to Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel. Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company. PDS has selecte
May 15, 2012 Read time: 2 mins
Hindhead road tunnel.
Paul Ducker Systems (PDS), a sub-contractor to 1146 Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel.

Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company.

PDS has selected Team Simoco to design and implement an extensive communication system for the tunnels, with each requiring GSM mobile, Airwave, fireground, DAB, voice-break in and a dedicated PMR radio system.
Chief executive of Team Simoco, Ian Carr, says: “Both the Hindhead and Hatfield road tunnels are designed to offer vehicles more convenient and quicker journeys, but due to the high volumes of traffic that travel along these routes, it is imperative that the communication systems in place offer reliable and uninterruptable access in case of accidents or fires.

“Team Simoco has extensive experience of confined space radio engineering, leaky feeder technology and the specific signal propagation challenges of combining multiple radio services in enclosed environments such as tunnels. This expertise enabled us to work with PDS to design the best operational solution for the Hindhead and Hatfield tunnels.”

Located in County Surrey, between London and Portsmouth, the Hindhead twin-bore road tunnel is designed to remove traffic congestion from the A3 and the local road network. Work began on the project in 2007 and the tunnel is scheduled to open to traffic in summer 2011. The Hatfield road tunnel in Hertfordshire is also due to be reopened to traffic in the summer of 2011.

For more information on companies in this article

Related Content

  • SRL’s outta sight VMS
    June 10, 2025


    England’s National Highways agency is using a variable message sign(VMS)  to display non-regulatory messages to indicate that maintenance teams may be out of sight.

    The is the first time that such messages have been displayed in an effort to better communicate to drivers that ahead lay obstacles, diversions road works. The system from SRL Traffic Systems is displaying wording not usually used, including ‘Working even out of view’, to provide an awareness of operations not within eyesight of a driver or outside of the public eye.

  • Beyond cost: forging a solutions-led partnership for highways carbon-saving
    December 30, 2024
    Changing highways procurement is increasingly focusing material specification to drive carbon savings as well as cost. A longstanding partnership between Huyton Asphalt and Tarmac is delivering new solutions for highways clients in the UK.
  • Analysing carbon quantities for construction
    October 14, 2024
    Using software tools can help analysing carbon from for construction works.
  • Asphalt milling optimised by 3D controls
    February 20, 2012
    3D machine controls can optimise milling efficiency, Mike Woof reports. More efficient milling and recycling operations can be carried out by using the latest 3D control systems on the market. At the last Trimble Dimensions event in Las Vegas, the advantages of 3D controls for milling operations proved a key topic. The use of 3D control systems can offer huge advantages in milling operations. This technology helps increase productivity as the milling machine will only remove what is required, which also hel