Skip to main content

Communications systems key to tunnel safety

Paul Ducker Systems (PDS), a sub-contractor to Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel. Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company. PDS has selecte
May 15, 2012 Read time: 2 mins
Hindhead road tunnel.
Paul Ducker Systems (PDS), a sub-contractor to 1146 Balfour Beatty Engineering Services, has appointed Team Simoco to provide communication systems for the new A3 Hindhead road tunnel and the refurbishment of the A1 Hatfield road tunnel.

Specialising in supplying transportation infrastructure for tunnels and road networks, PDS also provides solutions to metro, rail and airport operators, and the Hindhead and Hatfield road tunnels, near London, are the latest contracts to be won by the company.

PDS has selected Team Simoco to design and implement an extensive communication system for the tunnels, with each requiring GSM mobile, Airwave, fireground, DAB, voice-break in and a dedicated PMR radio system.
Chief executive of Team Simoco, Ian Carr, says: “Both the Hindhead and Hatfield road tunnels are designed to offer vehicles more convenient and quicker journeys, but due to the high volumes of traffic that travel along these routes, it is imperative that the communication systems in place offer reliable and uninterruptable access in case of accidents or fires.

“Team Simoco has extensive experience of confined space radio engineering, leaky feeder technology and the specific signal propagation challenges of combining multiple radio services in enclosed environments such as tunnels. This expertise enabled us to work with PDS to design the best operational solution for the Hindhead and Hatfield tunnels.”

Located in County Surrey, between London and Portsmouth, the Hindhead twin-bore road tunnel is designed to remove traffic congestion from the A3 and the local road network. Work began on the project in 2007 and the tunnel is scheduled to open to traffic in summer 2011. The Hatfield road tunnel in Hertfordshire is also due to be reopened to traffic in the summer of 2011.

For more information on companies in this article

Related Content

  • Airport's high demands on asphalt and concrete techniques
    July 11, 2012
    Airport runway, taxiway and parking areas make high demands on paving requirements, both with concrete and asphalt techniques. Mike Woof reports. High quality surface finishes are required in airport environments for runways, taxiways and aircraft parking areas. Because of the speed at which aircraft take off and land and the massive forces exerted due to the weight of the aircraft, particularly during landing, runway structures need to be incredibly strong. The surfaces also have to be constructed to very
  • New Clyde bridge project
    March 12, 2021
    A New Clyde bridge project is going ahead.
  • Denver light rail contract awarded
    July 31, 2015
    Denver’s Regional Transportation District (RTD) Board of Directors has approved a US$140 million two-phased contract award to Balfour Beatty Infrastructure (BBII) to design and build the Southeast Rail Extension. Design will begin during the fall with construction expected to start in spring 2016. The Southeast Rail Extension will build an additional 2.3 miles of light rail on the existing Southeast Rail Line south of Lincoln. When complete it will include an end-of-line station at RidgeGate Parkway,
  • Lumitex lights up Melbourne's EastLink tunnels
    June 18, 2021
    The 1,066 high-pressure sodium lights have been exchanged for 1,174 Lumitex LEDs throughout the EastLink network's 1.6km twin tunnel complex in Melbourne, Australia.