Skip to main content

Bidding strong for New York bridge link

Bidding is strong for the 30 year concession deal covering the Goethals Bridge linking New York and New Jersey. The contract will include financing, construction and management of the bridge and changes to the road alignment in a deal worth US$1.3 billion.
February 10, 2012 Read time: 1 min
RSSBidding is strong for the 30 year concession deal covering the Goethals Bridge linking New York and New Jersey. The contract will include financing, construction and management of the bridge and changes to the road alignment in a deal worth US$1.3 billion. The bids are being evaluated by the 2422 Port Authority of New York and New Jersey. Interest is strong, partly because this tolled link carries some 30 million vehicles/year. Firms tendering include the NYNJ Link Partnership (comprising 981 Hochtief, Kiewit, 2378 Macquarie, 1374 Parsons Transportation Group and 1375 Weeks Marine); China State Construction Engineering Corporation (CSCEC), 2296 Skanska of Sweden and IHI of Japan. 4914 FCC is submitting a bid with 1377 Globalvia while 917 ACS is in partnership with 1378 John Laing. 976 Acciona joined Tutor Perini and 2516 Bilfinger and Berger while 980 OHL is in parternship with 1380 Judlau Contracting and 5177 Vinci of France

Related Content

  • Major highway upgrade planned for Israel
    September 14, 2012
    Plans are in hand in Israel to widen a 21km stretch of the Road 6 highway and strong interest has been shown in the tender process. Also known as the Cross-Israel Highway and the Yitzhak Rabin Highway, Road 6 is a major transport artery for the country. The construction work required would be for widening of sections 3 and 7 of Road 6 and the project is worth US$880.6 million and also includes a 35 year concession to operate the route.
  • Montreal’s Champlain Bridge superstructure deal signed with Canam-Bridge
    May 22, 2015
    Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America. The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium con
  • Four lane highways for India
    February 24, 2012
    A new four lane highway is being built under a design, build, finance and operate (DBFO) basis in India's Jammu & Kashmir state.
  • Israel's key highway on track
    February 16, 2012
    In Israel the authorities are well on track with the project to build northern extension of the Cross-Israel Highway. This road forms part of the US$7.98 billion Netivei Israel transport plan project. Israel's Ministry of Transport and Ministry of Finance will evaluate the tenders jointly and then announce firms that pass the prequalification stage at the end of September 2011. The companies that have prequalified are Electra, Ashtrom Properties, Minrav Holdings, Shafir Civil and Marine Engineering, Shikun