Skip to main content

Signify to light up Massey Tunnel

The LED replacements in the Vancouver area tunnel are Lumec TunnelView, made by Signify.
By David Arminas January 15, 2021 Read time: 2 mins
Lumec TunnelView luminaires, made by Signfy, come in small, medium and large sizes and all can be mounted on a wall or a ceiling

A major lighting upgrade is underway in the ageing George Massey Tunnel within the greater Vancouver area in western Canada.

Being replaced are 400W high pressure sodium units that were custom-made for the tunnel and installed in 2005. The aging power system limits lighting output of the old fixtures, according to the British Columbia provincial government. The current project includes upgrading the power system.

The LED replacements are Lumec TunnelView, made by Signfy, based in the Netherlands. The lights come in small, medium and large sizes and all can be mounted on a wall or a ceiling. There are nine mounting options suitable for tunnels and underpasses, according to the company. There is a slip fitter mount and a swivel mount. The fixed-bracket option allows for positioning of  -15°, -10°, -5°, 0°, 5°, 10° and 15°.

The contract valued at nearly US$15 million, is part of $40 million worth of interim safety and reliability improvements ahead of a likely replacement for the tunnel.

“We continue to move ahead with our work to replace the George Massey Tunnel, but in the meantime, we are making immediate safety improvements,” said Claire Trevena, minister of transportation and infrastructure for the province of British Columbia. “Plans for the new future crossing are underway with a business case expected to be ready for the fall.”

Other work now ongoing includes improving tunnel drainage to prevent ice build-up and water from pooling at tunnel entrances. The ventilation and electrical systems will also be upgraded. The majority of work will be done at night and all improvements are scheduled to be completed by spring 2021.

The aging 61-year-old tunnel, part of the busy Highway 99 along the Pacific coast and runs under the Fraser River. It is also Canada’s only tunnel below sea level. The tunnel now carries more than its design limit of 80,000 vehicles a day. Extensive renovations to the tunnel and attempts to improve access roads have been done over the years, but the structure has only about 10 years of useful life, according to some reports.

An earlier replacement proposal – a 3km-long 10-lane cable stay bridge costing US$2.8 billion - was underway in 2015 with the government saying that construction was on target to start in 2017 with completion in 2022. But a new provincial government was elected in 2017 before work started and the project was scrapped.

For more information on companies in this article

Related Content

  • Cowi wins Massey Tunnel design
    July 22, 2022
    Cowi has won a contract as owner's engineer for an eight-lane replacement immersed tunnel under the Fraser River near the Pacific coast city of Vancouver. Cowi said it will draw on its experience designing the original four-lane George Massey Tunnel in 1959 and whose removal the engineering firm will later oversee.
  • Flatiron wins Steveston work in Canada
    April 18, 2022
    The Steveston Interchange project near Vancouver is key for improving traffic flow into what will be a new immersed Massey Tunnel under the Fraser River.
  • Vancouver’s 10-lane bridge replacement for Massey Tunnel remain undecided
    October 23, 2015
    Construction of a 10-lane bridge to replace a congested river tunnel in Vancouver, Canada, is still on target to start in 2017, despite details remaining sketchy.

    The bridge will replace the 60-year-old George Massey Tunnel between the local cities of Richmond and Delta along the provincial Highway 99. But the cost and – importantly – whether it will be a toll bridge have not been declared by the British Columbia provincial government.
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove