Skip to main content

Signify to light up Massey Tunnel

The LED replacements in the Vancouver area tunnel are Lumec TunnelView, made by Signify.
By David Arminas January 15, 2021 Read time: 2 mins
Lumec TunnelView luminaires, made by Signfy, come in small, medium and large sizes and all can be mounted on a wall or a ceiling

A major lighting upgrade is underway in the ageing George Massey Tunnel within the greater Vancouver area in western Canada.

Being replaced are 400W high pressure sodium units that were custom-made for the tunnel and installed in 2005. The aging power system limits lighting output of the old fixtures, according to the British Columbia provincial government. The current project includes upgrading the power system.

The LED replacements are Lumec TunnelView, made by Signfy, based in the Netherlands. The lights come in small, medium and large sizes and all can be mounted on a wall or a ceiling. There are nine mounting options suitable for tunnels and underpasses, according to the company. There is a slip fitter mount and a swivel mount. The fixed-bracket option allows for positioning of  -15°, -10°, -5°, 0°, 5°, 10° and 15°.

The contract valued at nearly US$15 million, is part of $40 million worth of interim safety and reliability improvements ahead of a likely replacement for the tunnel.

“We continue to move ahead with our work to replace the George Massey Tunnel, but in the meantime, we are making immediate safety improvements,” said Claire Trevena, minister of transportation and infrastructure for the province of British Columbia. “Plans for the new future crossing are underway with a business case expected to be ready for the fall.”

Other work now ongoing includes improving tunnel drainage to prevent ice build-up and water from pooling at tunnel entrances. The ventilation and electrical systems will also be upgraded. The majority of work will be done at night and all improvements are scheduled to be completed by spring 2021.

The aging 61-year-old tunnel, part of the busy Highway 99 along the Pacific coast and runs under the Fraser River. It is also Canada’s only tunnel below sea level. The tunnel now carries more than its design limit of 80,000 vehicles a day. Extensive renovations to the tunnel and attempts to improve access roads have been done over the years, but the structure has only about 10 years of useful life, according to some reports.

An earlier replacement proposal – a 3km-long 10-lane cable stay bridge costing US$2.8 billion - was underway in 2015 with the government saying that construction was on target to start in 2017 with completion in 2022. But a new provincial government was elected in 2017 before work started and the project was scrapped.

For more information on companies in this article

Related Content

  • Summer paving schedule set for British Columbia
    June 15, 2022
    Around US$40 million will be spent on paving projects by Canada’s Pacific Ocean coast province.
  • George Massey Tunnel Replacement gets environmental approval
    February 13, 2017
    The Canadian province of British Columbia has given environmental approval for a 10-lane US$2.8 billion bridge to replace the ageing George Massey Tunnel near Vancouver. However, approval for the 3km cable stay bridge over the Fraser River comes with 33 conditions, according to Canadian media. Construction of the toll bridge will also mean replacing the interchanges of Westminster Highway, Steveston Highway and Highway 17A.
  • British Columbia issues RFQ for US$2.7 billion Massey Bridge
    June 30, 2016
    Canada’s provincial British Columbia government has issued a request for qualification for construction of a US$2.7 billion bridge over the Fraser River around the city of Vancouver. The 10-lane bridge will be built under a 30-year public-private partnership agreement and will include tolled transit lanes and related Highway 99 improvements between Bridgeport Road in the adjacent city of Richmond and Highway 91 in the city of Delta. The 60-year-old tunnel now carries its limit of 80,000 vehicles a day an
  • Work starts on Steveston Interchange
    July 11, 2022
    The Steveston project near Vancouver is part of the overall Highway 99 Tunnel Programme that will replace the aging George Massey Tunnel under the Fraser River.