Skip to main content

Mallatite and TRT Lighting brightens up Scotland’s Erskine Bridge

Mallatite has supplied aluminium lighting columns and LED road lanterns as part of the Erskine Bridge Lighting and Electrical Refurbishment Project for Transport Scotland. The project is set to enhance night-time driving visibility and reduce energy consumption by up to 80% through the use of dimming. The A898 Erskine Bridge is a 15-span cable-stayed box girder bridge in west central Scotland that opened to traffic in 1971. The longest span is 305m. Around 42,000 vehicles use it daily to cross the River
December 15, 2017 Read time: 2 mins
Bright nights ahead for Erskine Bridge thanks to Mallatite and TRT Lighting

Mallatite has supplied aluminium lighting columns and LED road lanterns as part of the Erskine Bridge Lighting and Electrical Refurbishment Project for Transport Scotland

The project is set to enhance night-time driving visibility and reduce energy consumption by up to 80% through the use of dimming. The A898 Erskine Bridge is a 15-span cable-stayed box girder bridge in west central Scotland that opened to traffic in 1971. The longest span is 305m. Around 42,000 vehicles use it daily to cross the River Clyde as well as he parallel Forth and Clyde Canal and the North Clyde railway line. A small part of Kilpatrick railway station is situated underneath the bridge at the north side.

Almost 300 TRT Lighting’s Aspect lanterns were supplied as part of the renovation project by Traffic Scotland to improve visibility, safety and ultimately reduce energy consumption not just across the bridge but also on the northern and southern approach roads.

Each individual luminaire is fitted with an 868MHz node allowing offsite control and monitoring all being fed back to a central control station. Contractor Lightways installed around 100 Mallatite aluminium columns and the TRT Aspect LED road lanterns.

Phase One of the project was to improve lighting levels and reduce energy usage on the North and South approaches to the bridge. Nearly 60 of Mallatite’s 12m aluminium columns complete with Aspect LED road lanterns were supplied for the south approach. Around 130 Aspect LED lanterns were supplied to upgrade the existing high-mast columns on the north approach.

By working at night and using traffic management, Lightways was able to keep one lane open in each direction.

Phase Two involved replacing the majority of the twin-armed columns on the deck of the bridge. All of the existing lanterns were also to be upgraded to LED. To keep on schedule and budget, new columns had to use the existing deck foundations.

Mallatite manufactured bespoke flange-plated columns to fit the existing foundations, enabling Lightways to replace the initial 27 columns in just five nights, said Alan Paterson, managing director of Mallatite.

Related Content

  • Micro surfacing the Brooklyn Bridge with Bergkamps’ M210 paver
    May 16, 2018
    A major job for micro surfacing took place on the Brooklyn Bridge near New York. It was the third time in Ken Messina’s career that he would provide micro surfacing for the iconic Brooklyn Bridge, built in 1883. Messina, as president of New Jersey-based Asphalt Paving Systems (APS), knew only too well the challenges that lay ahead. And there were many. There would be only a brief window of opportunity for paving, with lane closures starting at 10pm and ending at 5am. The cool, humid atmosphere would a
  • Meva’s Mammut 350 formwork makes the difference for Neckar viaduct
    April 19, 2018
    Formwork specialist Meva is helping replace the longest motorway bridge, the Neckar River viaduct in Germany’s south-west state Baden-Wuerttemberg Work on the 1.3km Neckar viaduct, part of the A6 motorway at Heilbronn, should be finished by 2022. It is part of the A6 expansion project between the Weinberger junction and Wiesloch/Rauenberg. The project is officially the new Neckar viaduct BAB 6 at Heilbronn. Federal Motorway 6, the A6, is also known as the BAB 6. The 477km motorway starts at the French b
  • Bridge of international accord from Russia-China
    May 29, 2018
    A new bridge project joining China and Russia is a sign of international accord between the two nations – Mike Woof writes A new bridge spanning what China calls the Heilongjiang River and which is known as the Amur River in Russia, is a clear sign of an important international accord between the two countries. Discussions over the bridge project were first started between China and Russia in the 1980s, with both nations seeing many changes in leadership since that time. But while the political discussion
  • Traffic control solution manufacturers win key project works
    September 26, 2013
    Traffic control system manufacturers have recently supplied some of their cutting-edge technology to major projects in Europe. Meanwhile, in southern Asia, another leading firm in the sector is helping reduce chronic traffic congestion in Indonesia’s capital, Jakarta. Guy Woodford reports Solutions supplied by Siemens Mobility & Logistics (M&L) are helping the Rijkswaterstaat improve traffic conditions at the Coentunnel in Amsterdam, one of the most heavily used traffic arteries in the Netherlands, used