Skip to main content

Kapsch equips Olympia Odos motorway with toll rebate stations

Kapsch TrafficCom has equipped the Olympia Odos Greek motorway with 30 free flow rebate stations. The contract was awarded by the Canadian IBI Group, which has a contract with the Apion Kleos Construction joint venture of Olympia Odos. The deal is for Kapsch’s ongoing technical support for service and maintenance based on a yearly agreement. Kapsch says that the 202km Olympia Odos is one of Greece’s most significant motorway concessions, linking the capital Athens with the city of Corinth and Patras
October 1, 2019 Read time: 2 mins
259 Kapsch TrafficCom has equipped the 3286 Olympia Odos Greek motorway with 30 free flow rebate stations.


The contract was awarded by the Canadian IBI Group, which has a contract with the Apion Kleos Construction joint venture of Olympia Odos. The deal is for Kapsch’s ongoing technical support for service and maintenance based on a yearly agreement.

Kapsch says that the 202km Olympia Odos is one of Greece’s most significant motorway concessions, linking the capital Athens with the city of  Corinth and Patras Port.

The planned upgrade offers the first distance-based pricing model in Greece, available to all electronic toll collection users of Olympia Odos. The solution is based on the concept of providing a rebate to road users if they don’t travel the totality of the distance corresponding to an average distance charging zone (the current charging model). This new model is considered a hybrid or rebate system.

The new solution involves equipping 30 entry and exit ramps with full tolling and enforcement stations for detection and classification of passing vehicles. The journeys recorded by the roadside systems are paired with those recorded in conventional toll plazas to calculate the rebate amount.

For more information on companies in this article

Related Content

  • Champlain Bridge set to open by end of year, says SNC-Lavalin
    March 6, 2018
    The replacement Champlain Bridge in Montreal will open on schedule at the end of the year, according to the SNC-Lavalin-led consortium heading the project. Cost of the entire corridor project is set at US$3.3 billion of which around $1.8 billion is for construction of the bridge, approach roads and highway adjustments. Failure to open the bridge to vehicular traffic on time means the consortium faces stiff fines, according to media reports: around $77,500 a day for the first seven days followed by $31
  • Volvo wins on aggregate
    December 3, 2013
    In the Canadian city of Coquitlam, 3,628tonnes of glacial clay is being excavated every day across a 90hectare aggregate open-pit mine. LaFarge in North America is the largest diversified supplier of construction materials in the United States and Canada. For the last decade the company has used Greater Vancouver-based contractor, Vertex Excavating, to work across its 90hectare aggregate open-pit mine, exposing and transporting some of the best concrete aggregate material available on the market. Th
  • Flashy WiM from HHB Batsch Dynaweigh
    November 29, 2022
    Total mass, axle load, vehicle type and license plate number are forwarded with a photo of the vehicle automatically in real time by means of the Weight Flasher.
  • Teams shortlisted for Pattullo Bridge replacement near Vancouver
    March 1, 2019
    The Canadian province of British Columbia has shortlisted three consortia to design and build a US$1.06 billion Pattullo Bridge replacement near Vancouver. Fraser Community Connectors is led by Kiewit Canada Development. Kiewet Infrastructure BC is the design-build contractor. The long-span bridge design contractors are T.Y. Lin International and International Bridge Technologies. A joint venture of Flatiron Constructors, Dragados Canada and Carlson Construction Pattullo includes ACS Infrastructure Ca