Skip to main content

Enerpac’s SL100 floats like a butterfly

An Enerpac SL100 gantry mounted on a pontoon recently provided a stable lift for a 48tonne bridge deck in the Netherlands.
July 22, 2020 Read time: 2 mins
An Enerpac SL100 gantry positioned on the pontoon

Heavy lift specialist LGH was operating in the small village of Burdaard on a site with no room for a mobile crane. Instead, LGH used its Enerpac telescopic hydraulic gantry to assist the removal of the village’s Steenhuisenbrug bridge.

As part of regional highway upgrades, the bridge was being refurbished and temporarily replaced with an emergency pedestrian bridge, explained Niels van der Breggen, national sales manager at LGH.

Transporting the bridge deck suspended from the Enerpac SL100 gantry
Transporting the bridge deck suspended from the Enerpac SL100 gantry

The Enerpac SL100 gantry was positioned on a pontoon either side of the bridge deck. Slings were then suspended from the gantry’s header beams and attached to the deck. Using the gantry’s wireless controller, the deck was lifted clear of the bridge and the pontoon was rotated to allow the deck to be moved 100m along the waterway.

The deck was then lifted by crane onto nearby land for refurbishment over the next six weeks.  

With a lifting capacity of 100tonnes, the Enerpac SL100 Super Lift hydraulic gantry uses a narrow 610mm track gauge for accurate load positioning in confined or limited-access spaces. It is easy to mobilise and demobilise and includes self-contained hydraulics allowing quicker and safer deployment.

Each gantry leg features self-propelled wheels for travel along the narrow-gauge track. There is also an Intellilift control system for wireless control, unrestricted operator position and automatic synchronisation for lifting/lowering and travelling.

For more information on companies in this article

Related Content

  • New milling machine from Bomag
    November 24, 2021
    Bomag is launching its new BM/65 series of cold planers
  • Sophisticated paving technology
    March 22, 2021
    Trimble is introducing its sophisticated Roadworks 3D Paving Control Platform for Asphalt Pavers.
  • On track with Kistler
    February 15, 2022
    How to survey and safeguard a sensitive load-bearing road above a section of railway line? This was the challenge facing Revotec, a Vienna-based bridge monitoring specialist. The solution was KiTraffic Statistics, the weigh-in-motion (WIM) system from Kistler.
  • Bomag is on track – London to Glasgow in 2 hours and 40 minutes
    July 1, 2022
    British Railways has big plans. Trains on the first 220 km from London Euston Station to Birmingham could be travelling at a speed of 360 km/h (225 mph) in as little as 10 years. The earthworks required for this are to be completed by as early as 2025. The project is considered one of the largest and most ambitious infrastructure projects in recent British history. It must meet the highest possible construction quality standards and evolve over the course of the project - setting new standards today and for tomorrow. The deployment of innovative BOMAG technologies and machines is therefore logical and consistent.