Skip to main content

Ecolighting lights the way with Medusa LED streetlighting

Ecolighting says that its latest LED street luminaire, Medusa, is weatherproof to IP65 and comes with an adjustable pole mounting. The Medusa is designed with a Philips advanced Xitanium driver, Samsung or Cree LEDs and an NEMA five-pin plug which comes as standard for telematics such as TELENSA or similar open protocols. Ecolighting says that the Medusa is ideal for use in streets, security, car parks and building exteriors. Importantly, it enables big cost savings and makes a substantial difference
May 8, 2019 Read time: 2 mins
Before

Ecolighting says that its latest LED street luminaire, Medusa, is weatherproof to IP65 and comes with an adjustable pole mounting.

The Medusa is designed with a 2368 Philips advanced Xitanium driver, Samsung or Cree LEDs and an NEMA five-pin plug which comes as standard for telematics such as 2619 TELENSA or similar open protocols.

Ecolighting says that the Medusa is ideal for use in streets, security, car parks and building exteriors. Importantly, it enables big cost savings and makes a substantial difference to energy bills, according to the company.
    
By using top quality LEDs in Medusa, Ecolighting ensures high thermal conductivity, minimal light decay, pure light, very stable performance and a 50,000-hour lifespan. As a result, Ecolighting offers a 10-year conditional guarantee with optional photocell control and a pre-programmed dimming cycle for smaller projects.

The Medusa comes in three body sizes and 10 different LED power outputs from 14-250W. The system uses LEDs producing 115 lumens per watt and a colour temperature of 5000K, top quality modular drivers and has surge protection to 10KV.
 
The company says that the Medusa has no radiation or emitting heat and is free from mercury, lead and other harmful substances. Its head can be adjusted from 0-90°, the optical design suits different roads, and it has a 70:30° road to pavement ratio. Its thermal management design has an effective low LED junction temperature which ensures the lifespan of the light source and its power supply.
 
For ease of installation, the streetlight has a built in spirit level and there are different power supply solutions available whether dimming or not dimming. The body comes with an advanced clip for tool-less operation and an easy to maintain fixed brace.
 
Ecolighting says that an installation of Medusa streetlight in Manchester reduced energy consumption by more than 60% on the previous lighting system.

Ecolighting
%$Linker: 2 External <?xml version="1.0" encoding="utf-16"?><dictionary /> 0 0 0 link-external www.ecolightinguk.com false https://ecolightinguk.com/ false false%>

For more information on companies in this article

Related Content

  • Dubuis’s cutting-edge crimping
    January 6, 2017
    France-based Dubuis is unveiling its new Neoelec in line BPL36 crimping tool at Intermat 2012.The company, bought by Stanley Black&Decker in 2006, has designed a crimper with 35kN force and 8mm stroke, weighing 2.1kg and capable of 4-185mm² hexagonal crimping.
  • Dubuis’s cutting-edge crimping
    February 6, 2012
    France-based Dubuis is unveiling its new Neoelec in line BPL36 crimping tool at Intermat 2012.The company, bought by Stanley Black&Decker in 2006, has designed a crimper with 35kN force and 8mm stroke, weighing 2.1kg and capable of 4-185mm² hexagonal crimping.
  • Plan worth sticking too
    April 8, 2013
    Plan supplies turn-key plants for the manufacture of precast concrete elements for civil, industrial and commercial buildings. The company’s machinery and plants are designed and built with innovative and useful solutions to produce wall panels, columns, beams, roof elements, hollow-core slabs. Plan can also provide special bespoke products on request. The firm’s services also include installation and commissioning, factory design, electrical and mechanical design, operator training, and after-sales service
  • North Viaduct completed on UK’s Mersey Gateway bridge project
    April 19, 2017
    Concrete finishing work has started on the completed north approach viaduct of England’s new 2.13km Mersey Gateway project. Over the past three years, around 18,400m³of concrete was used to build the viaduct. When complete near the end of this year, around 60,000 vehicles are expected to use the toll bridge every day, or nearly 22 million vehicles annually.