Skip to main content

APE’s 45 highway barrier cuts toll lane occupancy

Aximum Produit Èlectroniques’ (APE) development of its new 45 highway barrier stems from what the French firm says is a search for better productivity through shorter toll lane occupancy, a reduction in ownership costs and reduced risks for toll employees during maintenance operations. Of the barrier’s name Frédéric Lardeur, APE’s marketing and communications director, said, “45° is the angle made when the barrier boom moves to open the toll lane. When a barrier opens, the boom traditionally makes a 90°
April 3, 2014 Read time: 3 mins
An APE 45 highway barrier installed at a tolling station for the Tunnel Prado-Carénage near Marseille, France
164 Aximum Produit Èlectroniques’ (APE) development of its new 45 highway barrier stems from what the French firm says is a search for better productivity through shorter toll lane occupancy, a reduction in ownership costs and reduced risks for toll employees during maintenance operations.

Of the barrier’s name Frédéric Lardeur, APE’s marketing and communications director, said, “45° is the angle made when the barrier boom moves to open the toll lane. When a barrier opens, the boom traditionally makes a 90° angle with the roadway.”

Lardeur said vehicles should not stop for long in toll lanes to keep traffic flowing freely, and stressed how many mechanical and electrical components are required to ensure very short barrier opening times. However, after several million vehicles pass the barriers, their components may become damaged and give way.

“Our Research Department has benefitted from its many years of expertise in the highway sector and the thousands of barriers installed in France, throughout Europe and also Africa,” continued Lardeur. “Reducing the [45] barrier’s opening time was the first objective. To achieve the reduction, APE developed the 45° motion which clears the lanes more quickly with minimum mechanical and electrical effort.”

Robustness and reliability are two essential characteristics for equipment subjected to very high constraints. The 45 barrier’s mechanical and electrical components were submitted to drastic fatigue tests, and its barrier mechanism is said by APE to be guaranteed for over four million operations.

“The 45 barrier is much safer for users than conventional barriers,” added Lardeur. “As a matter of fact, if it is hit by a vehicle the arm moves up and aside with a natural 45° motion. Its movement is stopped by the mechanism and the toll-light fitting. There is no damage to the vehicle and for the operator no boom needs to be replaced.

“To optimise the time a toll employee stands by the barrier, the mechanical and electrical control systems are accessed through the top. All moving parts are totally protected by hoods."

Toll managers already using APE barriers have no need to worry, said Lardeur, as the firm guarantees that all elements of the 45 barrier are compatible with existing installations. Over 90% of the 45’s components are already said to exist in APE’s barrier range.

For more information on companies in this article

Related Content

  • Another US$94.08mn for repairs to Hammersmith flyover in London
    June 14, 2013
    A further US$94.08 million (£60mn) is to be spent on fixing the Hammersmith flyover “monstrosity” in west London, England. Transport for London (TfL) is to fund a second phase of repairs to the structure’s badly corroded arches due to start in October 2013. The flyover was shut to all traffic just before Christmas 2011 to allow initial emergency arch repairs – leading to huge traffic chaos in west London – before being partially reopened a few weeks later. It was not fully opened until late May 2012.
  • Clever approach to reducing bridge vibrations
    November 14, 2013
    Reducing vibrations on a bridge, supplying high-quality binders to emerging countries and helping small and medium players with warm mix, this month’s stories showcase some innovative bitumen technology solutions - Kristina Smith reports The Kessock Bridge in the Highlands of Scotland has become the third bridge in the UK to be resurfaced with Gussasphalt. A dense mastic asphalt containing Nynas Endura N5, a polymer modified binder, Gussasphalt has been designed to have a longer life than standard mastic as
  • Industry leaders to design national model for EV deployment
    March 21, 2012
    A new coalition of executives from blue chip companies in the US transportation and utility industries has come together to design a large-scale electric vehicle (EV) demonstration project that will help create a comprehensive national model for EV deployment.
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.