Skip to main content

Texas highway underway

Work is now well underway on the new North Tarrant Express project in Texas.
February 23, 2012 Read time: 1 min
Work is underway on the new north Tarrant Express project in Texas
Work is now well underway on the new North Tarrant Express project in Texas. Clearance operations are being carried out to make way for the North Tarrant Express, a project that consists of a series of major improvements to the I-820 and SH 121/183 (Airport Freeway) highway corridor in northeast Tarrant County. The US$2 billion project is due to be completed in 2015. This project is intended to help reduce traffic congestion, improve safety and increase capacity in one of the country's fastest-growing regions. In addition to the design, right of way and utilities, the project will rebuild and expand 13 miles along I-820 and SH 121/183 from I-35W to the SH 121 split. This project will rebuild the existing four to six main lanes, add four toll-managed lanes, plus frontage roads and auxiliary lanes to double existing capacity. The project also includes two additional non-tolled main lanes which will also be added no later than 2030 at no additional cost. This PPP is using a combination of private funds with public funds to complete the 21km corridor in five years.

Related Content

  • Honduras to spend $100mn for road projects in 2015
    February 19, 2015
    At least US$100 million will be injected into road projects in Honduras during 2015, the majority of which will be under Public-Private Partnership (PPP) deals. The schemes will provide a welcome boost to the construction sector, which recorded a drop of 50% during 2014. Construction started last year on a $271 million logistics corridor to connect the country’s Atlantic and Pacific coasts. The two-lane 390km highway will cut congestion in key urban areas along the route, as well as improving connections to
  • Papua New Guinea mends its bridges
    February 28, 2022
    Under the latest tranche of the Sustainable Highlands Highway Investment Programme, 45 of the estimated 71 bridges will be completely replaced.
  • 12D for Christchurch
    June 12, 2012
    Australia's increasingly popular 12D Model software package for road design, terrain modelling, surveying and drainage has been selected as the main design and survey tool for the coordinated earthquake rebuild of Christchurch in New Zealand The 12D Model software will be the common platform for a group of consultants and contractors making up the recently formed SCIRT, standing for "Stronger Christchurch Infrastructure Rebuild Team". They will use it for survey, repair and rebuild of both the road netwo
  • Traffic control solution manufacturers win key project works
    September 26, 2013
    Traffic control system manufacturers have recently supplied some of their cutting-edge technology to major projects in Europe. Meanwhile, in southern Asia, another leading firm in the sector is helping reduce chronic traffic congestion in Indonesia’s capital, Jakarta. Guy Woodford reports Solutions supplied by Siemens Mobility & Logistics (M&L) are helping the Rijkswaterstaat improve traffic conditions at the Coentunnel in Amsterdam, one of the most heavily used traffic arteries in the Netherlands, used